Installation - Smeg KC90AO Instruction Manual

Table of Contents

Advertisement

INSTALLATION

Wall marking:
• Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the
centre of the area in which the hood will be installed.
• Draw a horizontal line at 650 mm above the hob for installation without the back panel, or at
height H (H = height of the visible part of the panel) for installation with the back panel.
• Mark a point (1) on the horizontal line, 100 mm to the right of the vertical reference line.
• Repeat this operation on the other side, checking that the two marks are levelled.
• Place bracket 7.2.1 on the wall as shown about 1-2 mm from the ceiling or upper limit
aligning the centre (notch) with the vertical reference line.
• Mark the wall at the centres of the holes in the bracket.
• Place bracket 7.2.1 on the wall as shown at X mm below the first bracket (X = height of the
upper chimney section supplied), aligning the centre (notch) with the vertical line.
• Mark the wall at the centres of the holes in the bracket.
EN
Wall drilling and bracket fixing
1 13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kc90axKc90poKc90px

Table of Contents