Step 3 - Rig The Storage Tank - Carrier 19MV Series Installation, Operating And Maintenance Instructions

Positive pressure storage system
Table of Contents

Advertisement

Rig the Storage Tank
Step 3 —
The complete 19XR system can be rigged as a single assembly.
See the rigging instructions on the label attached to the assembly.
Also refer to the rigging guide (Fig. 4), physical data in Tables 2
and 3, and contact surface and dimensions for the complete sys-
tem in Fig. 5. Lift the assembly only from the 4 points indicated in
the rigging guide. Each rigging cable must be capable of support-
ing the entire weight of the assembly.
FRAME
ASSEMBLY
CONTROL
PANEL
VALVE 2
VALVE 3
VALVE 4
VALVE 5
a19-2444
ENTERING
WATER
LEAVING
WATER
CONDENSER
19XR PUMPOUT UNIT
VALVE
ASSEMBLY
CONDENSER
a19-1570ef
OIL
SEPARATOR
COMPRESSOR
OIL
HEATER
a19-2444
OIL
SEPARATOR
Fig. 1 — 19XR Positive Pressure Storage System
CONTROL
BOX
Fig. 2 — 19XR Pumpout Unit: Typical Chiller Mount
Lifting the assembly from points other than those specified
may result in serious damage to the assembly and personal
injury. Rigging equipment and procedures must be adequate
for assembly. See Tables 2 and 3 for weights. (These weights
are broken down into pumpout unit and storage tank weights.
For the complete assembly weight, add all components
together.)
TERMINAL
CONTACTOR
STRIP
19XR CONTROL BOX (INTERIOR)
COMPRESSOR
4
WARNING
SWITCH
FUSES
TRANSFORMER
a19-1569ef

Advertisement

Table of Contents
loading

Table of Contents