Download Print this page

Siemens FC922 Installation Instructions Manual page 7

Fire alarm control panel
Hide thumbs Also See for FC922:

Advertisement

Ability for MNS NACs to be
configured as Silenceable
BACnet client Supervision timeout
to delay reporting network
supervision.
DACT Alarm, Trouble Supervisory
Retransmission interval
Loss of primary power - Door
unlocking timing
Releasing operation – Door
release operation timing
Interconnected/networked panel
loops pathway configuration
Alarm verification restart time
Alarm verification configuration
CO alarm tone programming
PAD-5 Trouble supervision
PAD-5 Ground Fault monitoring
Signal Silence Inhibit Feature
Siemens Industry, Inc.
Smart Infrastructure
N
NACs dedicated for MNS application
can be configured as Silenceable
Y
Ability for the BACnet supervision
timeout to be configured from 1s to 10
minutes.
DACT retransmission intervals can be
configured up to 24 hours
Y
Fire Control can be user defined
accordingly
Y
Releasing Control Group can be user
Y
defined accordingly
Interconnected/networked loops could
Y
be configured Class X, A or B
Alarm verification restart time user
defined
Y
Alarm verification devices in a cross-
N
zone operation
CO programming tone user defined
Y
Trouble supervision setting can be on
Y
or off
Ground fault supervision for the power
Y
supply can be activated or turned off
Signal Silence Inhibit range 0-30
Y
minutes
Acceptable-NACs dedicated for
MNS application must be configured
as Non-Silenceable .
Acceptable Range must be between
1 sec and 85 sec.
DACT retransmission intervals must
be configured up to 6 hours
Fire control to be configured to
within 10 minutes "unlocking" after
loss of primary power
Releasing Control Group to be
configured to 60 secs. Max release
Configuring Class X network loops
via the Redundancy management
configuration setting
Max restart time shall not exceed 30
seconds when accomplished on a
multiple circuit (zone) or system
basis
Alarm verification shall not be used
in initiating device circuits intended
for cross-zone operations
CO detector MUST be programmed
as Temporal 4
Error reporting must be "on" and
activated
Ground fault supervision must be
"on" and activated
ULC minimum is 5 minutes
A6V10356958_en--_ n
7

Advertisement

loading

This manual is also suitable for:

Fc924Ft924Fv922Fv924Vr2005Fc924-us ... Show all