Rinnai Demand Duo CX Series Installation Instructions Manual page 47

Commercial hybrid water heating system
Table of Contents

Advertisement

The PCB maintains communication between the tank and tankless via the tank thermistors to effectively
control the tank temperature based on the selected temperature on the tankless unit.
The system controller will energize (120V) the pump when the tank temperature drops. When the tank
temperature returns to the selected set temperature, the tankless will de-energize the pump and remain
in standby until the tank temperature drops again.
ATTENTION
Figure 58
Demand Duo
H-Series with SENSEI CX Installation Instructions
When power is supplied, the water heater will maintain pump operation.
If system is not in use for an extended period of time, disconnect power
from the system.
47

Advertisement

Table of Contents
loading

Table of Contents