Zhone 4300 Installation Instructions Manual page 15

4u outdoor cabinet
Hide thumbs Also See for 4300:
Table of Contents

Advertisement

Have the following equipment ready before beginning this procedure:
One drill
One 3/8" drill bit
One 7/16" wrench or socket
One ½" wrench or socket
A pencil
Optional wall mounting kit
Follow this procedure for wall mounting:
1. Pre-assemble the upper and lower wall mounting brackets to the cabinet as shown above.
2. Position the cabinet with mounting brackets against the wall and mark on the location of the mounting holes
on the wall.
3. Drill six (6) 3/8" diameter holes completely through the wall at the locations marked in step 2.
4. Lift the cabinet with mounting brackets into position against the wall.
5. Insert 5/16" diameter bolts through the upper mounting bracket.
6. Secure the cabinet to the wall by installing 5/16" flat washers, lock washers and nuts to the bolts inserted in
step 5.
7. Repeat steps 5 and 6 for the lower mounting bracket.
Lifting eyelets are provided to facilitate hoisting if desired.
4300-A2-ZZ40-20
November 2005
4300 4U Outdoor Cabinet Installation Instructions
15

Advertisement

Table of Contents
loading

Table of Contents