List of accessories supplied

The following accessories are supplied with the RDU:-
• Instruction manual (this document)
• Fitting template
• 3 off wing nuts, metal washers and 6 off white
plastic spacers
• Steam hose
• 2 off steam hose clips

Installation

With the VE05 or VE09 humidifier correctly mounted
on the wall, installed, commissioned and set to work in
accordance with the humidifier installation manual:-
1. Unpack the RDU, ensuring that all parts and
documents are removed prior to discarding the
packaging.
2. Electrically isolate the Vapac Unit and remove the
front cover of the humidifier.
3. Place the fitting template on top of the Vapac Unit
so that the front of the template is aligned with the
front of the humidifier.
Fixing hole location
Steam outlet position
Fixing hole location
Fitting template
4. Drill 3 x 10mm holes into the top of the Vapac Unit
casing in the positions shown on the template.
Ensure swarf caused by drilling is prevented from
entering the humidifier.
5. Remove the fitting template.
6. Place the RDU on top of the Vapac unit, lining up
the RDU steam inlet and the three fixing studs in the
previously drilled holes. Ensure two white plastic
spacers are inserted onto each of the fixing studs
between the RDU and the humidifier.
7. Secure the RDU in place from inside the Vapac
Unit using the three wing nuts and metal washer
supplied.
Vapac, Virtuoso VE Room Distribution Unit, Installation Manual, EN/FR/NL/DE 2024-02, D30151 1 Iss 0
Fixing wing nut
and metal washer
Steam hose fixed
with hose clips
View from the inside of the Vapac Unit
showing RDU in situ
8. Connect the steam hose between the cylinder outlet
and the RDU steam inlet, securing each end of the
hose with the hose clips provided.
9. Connect the electrical supply for the RDU fans to the
RDU terminals in the Vapac Unit. The cables for the
electrical supply exit the RDU from a cable gland
on the rear panel, lower left corner. The cables
should be run along the side of the Vapac Unit to
enter the unit through one of the cable knockouts on
the base of the unit for final connection to the RDU
terminals.
10. Replace the Vapac Unit cover.
1 1. Reinstate the electrical supply to the Vapac Unit.

Maintenance

The following items should be checked on an annual
basis:-
1. Tightness of all RDU fixings.
2. Condition of steam hose.
3. Tightness of steam hose connection clips.
4. Security of electrical connections.
5. Operation of RDU fans; if a fan has failed it should
be replaced immediately as it will affect the
performance of the RDU. The exploded view on
page 6 following shows the part number for the
fans.
6. Use a wet cloth to remove any scale and dust
accumulation at the manifold outlets.
7. Clean the RDU casing with a wet cloth and
vacuum.
8. Check the RDU and humidifier for signs of water
leakage, stains and calcium deposits.
Any fault(s) found should be rectified immediately.