Download Print this page

Advertisement

Quick Links

Failure to observe manufacturer's recommendations may invalidate warranty
This product meets the requirements of the RoHS Directive 2002/95/EEC
This product will meet the requirements of the Low Voltage Safety Directive 2006/95/EEC and the EMC Directive
2004/108/EEC when installed in accordance with the instructions contained in this manual.
Failure to comply with these instructions may invalidate the manufacturer's warranty or any certificate/declaration
Vapac Humidity Control Limited reserves the right to change the design or specification
VapaLite
Humidifier
Models LMV2 & LMV4
Please read these Instructions
Installation and Start-up
Installation in countries covered by EC Directives:
of conformance requested to be supplied with the unit.
of the equipment described in this manual without prior notice.
Vapac equipment is manufactured in England by:
Vapac Humidity Control Limited
BEFORE
®

Advertisement

loading

Summary of Contents for Vapac VapaLite LMV2

  • Page 1 Failure to comply with these instructions may invalidate the manufacturer's warranty or any certificate/declaration of conformance requested to be supplied with the unit. Vapac Humidity Control Limited reserves the right to change the design or specification of the equipment described in this manual without prior notice.
  • Page 2 VapaLite Positioning the VapaLite Unit DO mount the unit indoors. DO mount the unit close to the steam nozzle / steam pipe position. DO ensure adequate service access to the front of the unit (min 700mm). DO remove the cylinder, if necessary, to access the mounting holes in the back of the steam section.
  • Page 3 Vapac or other equipment. DO provide adequate fall for the drain pipework to allow free flow of water drained from each unit.
  • Page 4: Do's And Don'ts

    DO use steam hose / copper pipe of equivalent size to the steam cylinder outlet (∅22mm). Do use Vapac steam hose or well insulated copper pipe. Do keep steam hose as short as possible – under 2m for maximum efficiency.
  • Page 5 External Connections VapaLite Electrical Connections The wiring to the Vapac should be done by a qualified DC Signal electrician and the external over-current protection and wiring should comply with the appropriate Regulations and Codes of practice. The standard VapaLite unit is designed to suit 230V Power single phase electrical supply.
  • Page 6 With hard waters, a more frequent cylinder exchange must be expected and cylinder exchange 2 or 3 times a year can be the User LED State Description average situation. The normal scaling up of the Vapac steam RED Flashing 2 Unit initialising. If it remains in this cylinder is outside the Vapac warranty.
  • Page 7 The hoses used with and in the Vapac should be inspected at To dismantle and re-assemble pump, refer to diagram the normal service visits as part of normal maintenance.
  • Page 8 VapaLite Trouble-Shooting Check-List Preliminary Check: - Use manual drain position of the switch to check pump operation. Symptom: Check / cause / remedy Red ‘Power-On’ Neon – not lit - Check main power is connected and switched on. - Check security circuit is complete (fan interlock, high humidity over-ride). - Check power supply fuses.
  • Page 10: Installation Notes

    INSTALLATION NOTES Vapac Humidity Control Ltd Fircroft Way – Edenbridge – Kent – TN8 6EZ Tel: 01732 863447 Fax: 01732 865658 www.eaton-williams.com...

This manual is also suitable for:

Vapalite lmv4