Weil-McLain CGi 4 Series Manual page 10

Gas-fired water boilers
Hide thumbs Also See for CGi 4 Series:
Table of Contents

Advertisement

CGi
SERIES 4 — GAS-FIRED WATER BOILER —
1e
Prepare boiler location — air openings
Combustion air opening location and sizing
requirements depend on the clearances
around the boiler.
compared to Figure 1a, page 7.
If all clearances are at least equal to Fig-
ure 1a, page 7
of openings given on pages 10 and 11.
If ANY clearance is less than Figure 1a,
page 7
and located as shown in Figure 1b, page 7.
NOT
apply the sizing and location information
shown on page 10 or 11.
Air openings must be provided
Combustion and ventilation air openings to be in accordance
with the section "Air for Combustion and Ventilation," of the
National Fuel Gas Code, ANSI Z223.1/NFPA 54 – latest edi-
tion, or applicable provisions of the local building codes.
Provide adequate combustion and ventilation air
to assure proper combustion and reduce the risk
of severe personal injury, death or substantial
property damage caused by flue gas spillage and
carbon monoxide emissions.
Air opening options
Two openings — Air supply from inside the building
1. If the building is of
unusually tight construction
tion, next page), the
building must also be provided with
air openings directly to the outside
Figure 3, Figure 4 or Figure 5.
2. Buildings of typical construction should provide adequate com-
bustion air from natural infiltration, so additional air openings to
the building are not required.
3. See Figure 2. Provide
within 12 inches of the ceiling and the floor, sized per Figure 2.
Two openings — Air supply directly from outside
1. Air openings must be directly through an outside wall, or into a
space that connects directly to the outside (such as a ventilated
attic or crawl space, for example).
2. See Figure 3 —
Openings directly through an outside wall
— provide
two openings
floor, sized per Figure 3.
3. See Figure 4 —
Air supplied through vertical ducts
two openings
terminated within 12 inches of the ceiling and the
floor, sized per Figure 4.
4. See Figure 5 —
Air supplied through horizontal ducts
vide
within 12 inches of the floor and the ceiling,
two openings
sized per Figure 5.
10
Check the boiler placement
, apply the sizing and placement
, you must provide air openings sized
, sized and located per
through the interior wall,
two openings
within 12 inches of the ceiling and the
Boiler Manual
Figure 2
DO
Figure 3
Figure 4
(see defini-
Figure 5
— provide
— pro-
Air openings to interior spaces
Air directly through outside wall
Air from outdoors — vertical ducts
Air from outdoors — horizontal ducts
Part Number 550-142-302/0124

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgi-25Cgi-3Cgi-4Cgi-5Cgi-6Cgi-7 ... Show all

Table of Contents