Power-Down Procedures - IBM 3250 User Manual

Graphics display system
Table of Contents

Advertisement

0
0
Power On/Off
Switch
I
POWER
I
Figure 1-2. 3258 Panel
Power-Down Procedures
• IBM 3258 Channel Control Unit.
1. Switch power on by pressing
I
on the power on/ off switch (see
Figure 1-2).
2. Open the front door of the 3258 and set the ONLINE/OFFLINE
switch, on the operator panel, to ONLINE.
3. Observe the indicator above the ONLINE/OFFLINE switch. After a
short interval, the indicator should light to confirm that the 3258 is
online to the host system.
4. Close the front door.
I
DISPLAY
I
MSB---ROM DATA
LSB
[~_]
ROM ADDRESS
ALU DATA
MS DATA
AUTO
a a a a
RESl'.:T
C'Ot\JT!NUE
S!NGLE STFP
2
INSTR
1 (
) 3
ERROR
TEST MAN
/HALT
1/0
INTERFACE
cj
ONLINE
a
OFF LINE
r - - - - -
Online Indicator
OPERATOR
0
0
Offline Indicator
IBM 3251 Display Station Model 1. Switch power off by pressing 0 on
the power on/ off switch.
IBM 3255 Display Control Unit Models I and 2.
Switch power off by
pressing 0 on the power on/ off switch.
IBM 3258 Channel Control Unit:
1. Open the front door of the 3258 and set the ONLINE/OFFLINE
switch to OFFLINE.
2. Wait for the Offline indicator, below the ONLINE/OFFLINE switch,
to light.
3. Switch power off by pressing 0 on the power on/ off switch.
4. Close the front door.
Chapter L
Introduction
1·3

Advertisement

Table of Contents
loading

Table of Contents