Download Print this page

JAMES MARTIN VANITIES 318-V24-BRS-CRM Assembly Instructions

Porcelain sink and stand

Advertisement

Quick Links

Assembly Instructions
Porcelain Sink and Stand
318-V24-BRS-CRM
Brass Finish
318-V24-CHR-CRM
Chrome Finish
318-V24-MBK-CRM
Matte Black Finish
Version: 202311

Advertisement

loading

Summary of Contents for JAMES MARTIN VANITIES 318-V24-BRS-CRM

  • Page 1 Assembly Instructions Porcelain Sink and Stand 318-V24-BRS-CRM Brass Finish 318-V24-CHR-CRM Chrome Finish 318-V24-MBK-CRM Matte Black Finish Version: 202311...
  • Page 2 Tools Required: Sink Hardware: A: Plastic Washers Pencil level Tool C:Nut E:M8 Screw D:M8 Screwdriver Electric drill Hammer Base Hardware: Base Parts: F: Screw G:Screw I:M4 Screw J:Screw L:2.5 Allen Wrench H:Rubber Mat K: Floor Washers M:2.0 Allen Wrench...
  • Page 3 N + Q + S + T + Q Screw by hand. Screw by hand. Screw by hand. P + Q + R + Q + P...
  • Page 4 Screw the legs into the rail. Use a level tool and make sure that these parts are perfectly level. K: Floor Washers Determine the final installation position and mark the hole positions in pencil on the wall. When determining the installation position ,include the floor washers because the height will change once the floor washers are added.
  • Page 5 Fix each of the brackets onto Determine the final installation the wall using the 4 screws sink position and mark the hole provided. positions in pencil on the wall. Ensure that the screw heads are paralle to the floor. Please the 4 rubber washers into the 4 recesses as shown.

This manual is also suitable for:

318-v24-chr-crm318-v24-mbk-crm