Check Before Installing - ABB AKR30S-800A Installation And Maintenance Manual

Retrofill circuit breakers
Table of Contents

Advertisement

Check Before Installing
Danger
Sek ea eRe
et
must be ensured that the supply power to the
caplesion bazar
compartment is turned off/ compartment is de-
paces an for esr
energized for all the incoming
and outgoing
Protective Equipment.
circuits of the Low voltage switchgear prior to any
work being conducted on it.
e
During the installation and related work on the
A
DANGER
equipment, it must be ensured that the operator
is using the prescribed
PPE
for the specified
tasks.
e
Ensure only qualified personnel install, operate, service and maintain all electrical
equipment
These breakers are supported on a
rollout track in the same manner as the AKR breakers.
Racking cams on both sides of the breaker frame engage the drawout mechanism pins
fastened to both sides of the compartment.
Check to see that the breaker or breakers match their respective compartments. Look on
the
breaker
summary
sheet,
the front view
drawings,
breaker
nameplate,
and
on
the
identification card on the breaker shipping carton.
2TSA451009P0000 Rev-B
© 2020 Emax 2 Retrofill Circuit Breakers 800-5000A | 25