Disc Performance Verification - HP 64000 Reference Manual

Logic development system
Table of Contents

Advertisement

SYSTEM OVERVIEW MANUAL
MODEL 64000
After the development station has passed the performance verification, determine if it is
going to be the master controller or slave controller (see figure 2-24). Set one station to
master controller. Set SYSTEM CONTROL SOURCE switches to LOCAL MASS STORAGE.
Set SYSTEM BUS switches to "2". Connect the system bus cable between the disc and
master controller development station. Turn the development station power off.
Disc Performance Verification
NOTE
Disc performance verification and system load can only be
accomplished from a development station set as master
controller and with a tape drive unit.
Verify that 791 OH Voltage Select switch is set for the correct line voltage. Connect one end of
the system bus cable to the HP-IB Connector on the rear panel (see figure 2-16). Pull and lift
7910H front panel (see figure 2-17). Remove PCA access cover (by removing four knurled
screws). Set HP-IB Unit Address Switch to 0, then replace PCA access cover. Set rear-panel
power (LINE) switch to on.
2-34

Advertisement

Table of Contents
loading

Table of Contents