Tellabs 1134-OLT6 General Description, Installation And Turn-Up Procedures

Optical line terminal

Advertisement

Quick Links

Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up
Guide
Copyright © 2024 Tellabs
®
All Rights Reserved

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 1134-OLT6 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Tellabs 1134-OLT6

  • Page 1: Tellabs® 1134-Olt6 Optical Line Terminal Description, Installation, And Turn Up Guide

    Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide Copyright © 2024 Tellabs ® All Rights Reserved...
  • Page 2: Tellabs® Information

    Information in this publication is subject to change without notice. Trademarks The following trademarks and service marks are owned by Tellabs Operations, Inc. or its affiliates in the United ® ®...
  • Page 3: Table Of Contents

    Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide Table of Contents Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide......1 Tellabs® Information..........................2 Copyright................................2 Trademarks................................2 Proprietary................................2 Tellabs® 1131 Optical Line Terminal Description, Installation, and Turn Up Guide......4 Tellabs 1131 Installation.............................
  • Page 4: Tellabs® 1131 Optical Line Terminal Description, Installation, And Turn Up Guide

    1131 is a self-contained and sealed unit, for mounting in standard 23-in (58.4cm) and 19-in (48.3cm) size racks. This guide describes the 100−220 VAC powering, suggested mounting instructions and turn up and the initialization procedures for the OLT1131. The Tellabs®1131 has only one customer replaceable part, it has a replaceable power module.
  • Page 5 Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide Next     Page 5 of 35 © 2023,Tellabs Enterprise, Inc. All rights reserved.
  • Page 6: Tellabs 1131 Installation

    Use the following procedures to install the OLT1131 in a 23- or 19-inch equipment rack. The instructions provided in this section assume all of the components to be installed are being ordered from Tellabs®. If any component was not ordered from Tellabs®, refer to the installation instructions included with that component.
  • Page 7: Install The Tellabs 1131

    6. Remove the paint from a rail mounting hole adjacent to the left hand corner of the unit and connect the frame ground to the equipment rail.  The paint must be removed to ensure a good electrical connection to ground. 7. Refer to Power up the Tellabs 1131 for details on the 1131 power up sequence. Previous  |  Next Page 7 of 35 ©...
  • Page 8: Install 2:32 Splitter

    Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide Install 2:32 Splitter Install 2:32 Fiber Splitter If Passive Optical Network (PON) Protection Group (PPG) scheme is to be utilized, a 2:32 PON Fiber Splitter must be installed. Following completion of the installation of the 2:32 Fiber Splitter shelf...
  • Page 9: Tellabs 1131 Site Preparation

    Figure 1: 19’ Tellabs®1131 Optical Line Terminal The Tellabs®1131 is packaged and shipped to the customer, ready for installation. Note: Shelf extensions are required if the Tellabs®1131 shelf is to be installed in a 23-inch rack and must be ordered separately. Tellabs 1131 Specifications ·...
  • Page 10: Tellabs 1131 Specifications

    Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide Tellabs 1131 Specifications Specifications The following table lists the descriptions and specifications of the Tellabs®1131. Description Specification Input Power (1131) 100 - 250 V ac Frequency 45 - 65 Hz...
  • Page 11: Tellabs 1131 Communications Ports

    Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide Tellabs 1131 Communications Ports The Tellabs®1131 provides the communication ports and connections, called out in the illustration below. Refer to “Specifications”. Previous   |   Next Page 11 of 35 © 2023,Tellabs Enterprise, Inc. All rights reserved.
  • Page 12: Tellabs 1131 Power Availability

    Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide Tellabs 1131 Power Availability Ensure that there is an available 100/220 VAC outlet within six feet of the Tellabs®1131 unit. Previous   |   Next Page 12 of 35 © 2023,Tellabs Enterprise, Inc. All rights reserved.
  • Page 13: Facility Grounding

    Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide Facility Grounding Prior to beginning the installation, ensure that the facility grounding system is installed in accordance with EIA/TIA-607 Grounding and Bonding Requirements for Telecommunications in Commercial Buildings, United States Department of Agriculture Rural Utilities Service (RUS) Bulletin 1751F-810, and/or local practices, as applicable.
  • Page 14: Rack Mounting

    Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide Rack Mounting When selecting the installation rack and its location, the following items should be considered as part of that selection: · Elevated Operating Ambient - If installed in a closed or multi-unit rack assembly, the operating ambient temperature of the rack environment may be greater than room ambient.
  • Page 15: Installation Of Overhead Cable Trays

    Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide Installation of Overhead Cable Trays It is recommended that sufficient overhead cable trays are installed to accommodate both fiber and metallic cabling. Previous   |   Next Page 15 of 35...
  • Page 16: Tellabs 1131 Turn Up And Initialization

    Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide Tellabs 1131 Turn Up and Initialization Perform the following procedures to turn up the Tellabs® 1131 OLT: Turn Up the Tellabs 1131 · Power up the Tellabs® 1131 ·...
  • Page 17: Turn Up The Tellabs 1131

    To connect the Tellabs OLT1 Craft interface to your PC/Laptop: · Use a serial cable and insert the DB-9 connector into the Craft port on the Tellabs OLT1. o Connect the other end of the cable to the DB-9 connector on your PC/laptop.
  • Page 18 Note: The password is not displayed on the screen. 3. After logging in with the admin/tellabs default values, the following is displayed on the screen: Password expired, you must change your password to continue: Enter current password: _ ...
  • Page 19 Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide Note: If your selected password does not meet the system security rules you will be asked. to enter a valid password, follow the on-screen password policy guidance on creating a secure password.
  • Page 20 Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide Address: (IPv4 address) ......[192.168.1.2] : 192.168.1.2 Network Mask: ........[255.255.255.0] : 255.255.255.0 Default Gateway ........[192.168.1.1] : 192.168.1.1 16.The Element Management configuration output is displayed. | Element Management Configuration       ...
  • Page 21 Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide · The STAT OLT CPU LED and ACT LED goes solid GREEN · The fan speed changes as the ESU gains control · The STAT PON CPU LED goes solid GREEN The Tellabs® 1131 continues the initialization process, followed by a series of messages,...
  • Page 22: Power Up The Tellabs® 1131

    European Union. Note:  The Tellabs® 1131 does not have a power on/off switch, as it is not intended to power down the shelf while it is in service. Inserting the power cable will cause the unit to power up.
  • Page 23 Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide   Page 23 of 35 © 2023,Tellabs Enterprise, Inc. All rights reserved.
  • Page 24: Perform Optic Power Level Testing

    Perform Optic Power Level Testing This section provides the instructions for installing and testing the fiber connections using the optic power meter to measure power levels, after the Tellabs® 1131 has been turned up. Refer to “Turn up the Tellabs®...
  • Page 25 +0.5/1.122 +5/3.162 –27/0.002 –8/0.158  · If YES, you have verified the Tellabs® OLT has the correct optic power levels - go to “Install 2:32 Splitter Fiber Connections”. · If NO, use these procedures until the optic levels are within the recommended parameters specified in Table...
  • Page 26 Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide 10.If after following the above instructions, the optic levels cannot meet the levels spec- ified in Table 3, please contact Tellabs Technical Assistance Center (TAC). Refer to “Maintenance” for instructions. Previous   | ...
  • Page 27: Install 2:32 Splitter Fiber Connections

    Use the following procedure to verify and connect fiber optic cables between the OLT and the 2:32 fiber Splitter. Note 1: PON Protection Groups can be sourced from; 1) two PON ports on the Tellabs® 1131, or 2) PON ports on different PON cards in different OLTs. Note 2: Ensure that the proper fiber connectors are available before proceeding.
  • Page 28 Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide 3. Remove the protective cap from the fiber connector at the primary PON card. 4. At the OLT supplying the primary input, clean the connected fiber, according to local practices, and insert the fiber into the designated PON port.
  • Page 29: Maintenance

    Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide Maintenance Warning: The equipment in the following procedures shall be installed in a restricted access location from the general public. Only trained personnel shall be allowed access to perform maintenance functions after the equipment is installed and energized.
  • Page 30: Replace A Tellabs® 1131

    The customer will contact the Tellabs® Technical Assistance Center (TAC), if the Tellabs® 1131 becomes inoperable or if there is any damage to the unit after arrival. The Tellabs® 1131 will be boxed and shipped back to Tellabs for maintenance or a new replacement.
  • Page 31: Replace The Ac-Dc Rectifier

    If the rectifier Fault light displays RED, it indicates the rectifier is inoperable.    The rectifier should be shipped back to Tellabs® and a new rectifier will be sent to the customer’s site as a replacement. Follow the procedures below to remove the rectifier: Page 31 of 35 ©...
  • Page 32 5. Loosen the right and left screws that hold the rectifier retractable handles in position. 6. Remove the rectifier from the slot. 7. If the rectifier is not going to be shipped back to Tellabs, dispose of the rectifier ac- cording to local practices or regulations.
  • Page 33 Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide 1. Locate the package containing the rectifier. 2. Examine the package for any apparent damage. If damage is noted, contact Tellabs Technical Assistance Center for assistance and additional instructions.
  • Page 34 Tellabs® 1134-OLT6 Optical Line Terminal Description, Installation, and Turn Up Guide Note: The fan should turn counter-clockwise and air is pulled into the rectifier.   11.When the rectifier has stabilized, in approximately 8 seconds, push the retractable handles in so that they are flush with the power module faceplate. This will fully engage and lock the power module into place.
  • Page 35: Contact Us

    France: 01 85 64 04 05, option 6 Tellabs Technical Assistance Center Tellabs TAC is available 24x7x365. Our team is comprised of Support Engineers with years of telecommunications and networking experience, holding a variety of networking certifications in addition to the Tellabs Certification for the product(s) they support.

Table of Contents