ERL B-PRO Quick Start Manual

Multi-busbar protection relay
Hide thumbs Also See for B-PRO:

Advertisement

B-PRO Multi-Busbar Protection Relay
In our ongoing efforts to run our business in an environmentally sensitive way, we are encouraging
the use of PDF manuals and software downloads, available from our website. For your convenience,
links are provided below to all software files to be downloaded.
If you do wish to have a hard copy manual or software on CD, you may request those from our
Customer Support team (contact info below).
If you are reading a hard copy of this document, download the soft copy (includes links) from
our website's Support/Documents page, in the Quick Start Guide column.
http://www.erlphase.com/support.php?ID=documents

1. Downloading the required software and manual

a. The B-PRO MBB comes loaded with the requested firmware version. All required
software, as well as the release description of the latest firmware version, is available on
the
Software page
descriptions of any other firmware version.
b. Download the following software on your computer:
Relay C
B-PRO MBB Offliner
USB Driver
ERL 61850 IED Configurator
c. Install Relay Control Panel and B-PRO MBB Offliner
d. Install the USB driver
e. Install Null Modem
Download the
B-PRO MBB User
on the
Documents page

2. Hardware and operating system requirements

Minimum hardware requirements:
1 GHz processor
2 GB RAM
20 GB available hard disk space
USB port
Serial communication port
Quick Start Guide for
of our website. Contact the Customer Support team for release
ontrol
Panel
(if needed)
Manual. Other documents such as Drawings are also available
of our website.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the B-PRO and is the answer not in the manual?

Questions and answers

Summary of Contents for ERL B-PRO

  • Page 1 Support/Documents page, in the Quick Start Guide column. http://www.erlphase.com/support.php?ID=documents 1. Downloading the required software and manual a. The B-PRO MBB comes loaded with the requested firmware version. All required software, as well as the release description of the latest firmware version, is available on Software page of our website.
  • Page 2 1. Connect the power supply to #15, as shown in Figure 2. The wire used to connect to the power supply shall be at least 18 AWG (1.02 mm2), 600 V. 2. Ground the B-PRO MBB at #16, as shown in Figure 2 The relay is calibrated before it leaves the factory 4.
  • Page 3 (scroll to Relay & Recorder section).  Basic Instructions to Communicate with 4000 Series Relays The Application Notes page also contains a range of other valuable B-PRO MBB instructions and descriptions of specific applications. For further information and contact Customer Support at: support@erlphase.com...

Table of Contents