Maintenance; System Power-Off - Huawei SUN2000-125KTL-JPH0 User Manual

Hide thumbs Also See for SUN2000-125KTL-JPH0:
Table of Contents

Advertisement

SUN2000-125KTL-JPH0
User Manual
● Wear personal protective equipment and use dedicated insulated tools to avoid
● Before performing maintenance, power off the equipment, follow the

8.1 System Power-Off

Precautions
● If two inverters share the same AC switch on the AC side, power off the two
● After the inverter powers off, the remaining electricity and heat may still cause
Procedure
Step 1 Run a shutdown command on the SUN2000 app, SmartLogger, or network
management system (NMS).
For details, see the user manual of the corresponding product.
Issue 15 (2024-01-30)
D ANGER
electric shocks or short circuits.
WARNING
instructions on the delayed discharge label, and wait for a period of time as
specified to ensure that the equipment is not energized.
WARNING
inverters.
electric shocks and body burns. Therefore, put on personal protective
equipment (PPE) and begin servicing the inverter fifteen minutes after power-
off.
Copyright © Huawei Technologies Co., Ltd.
8

Maintenance

8 Maintenance
90

Advertisement

Table of Contents
loading

Table of Contents