Siemens UROSKOP D Installation Instructions Manual page 13

Table of Contents

Advertisement

Installation
Standard
cabinets
2-7
PC-
r
RAS
N4
Fluorospot
cabinet
M98
I
VIDEOMED
f
M 95
I
i
._._._.-.-.-.-.-.-.
il
MEMOSKOP
100/2K
D3
PAS-FG
M20
Ml6
r'
Wl/w2
-El
D841
Ml
P
j
'--1
296
1
v
---i-l
-17
N/////////////~////////////i
N3
I.I.rw
N2
Unit
Nl
POLYDOROS
cabinet
cabinet
50/8OSU
B
l
Check that all boards are firmly inserted.
Install the rear cabinet panels and connect with the ground wires.
Remove the transport securing devices marked with red.
Place the cabinets
according
to installation
plan:
Nl, Generator
N2, Unit control
additionally
for UROSKOP
0.2 und 03:
N3, l.I.-TV
additionally
for UROSKOP
03:
N4, Fluorospot
Fasten the top of thecabinets
with the supplied retaining brackets
to the wall to
prevent the cabinets from tilting when the modules are swivelled out.
In addition,
attach the cabinets to the floor, if necessary
(see PG).
Within the area of validity of the DHHS regulations
and the IEC 601 (VDE
0750), observe the following:
For reasons
of fire protection,
adapt the supplied aluminium plates to the re-
spective
cable out/et according
to unit cabling and attach to the bottom plate
of the power cabinet.
Note:
insert high-voltage
transformer
HI in the power cabinet only after ca-
bling the generator
(chap. 3).
Siemens AG
Medical
Engineering
Group
RLL5-310.031.01
.01.02
Rev.
01

Advertisement

Table of Contents
loading

Table of Contents