Haier GE NAMV1 Series Installation Instructions Manual page 13

One-piece variable speed air handler
Table of Contents

Advertisement

1.
2.
Remove the air handler access panel.
3.
connection box.
4.
5.
Replace the air handler access panel.
Control Panel Relocation
To avoid the possibility of moisture damage to the control
12.
1.
to the cabinet. Slide panel out.
2.
Slide the control panel into the notch on the electric
removed in Step 1, secure the control panel to the end
panel.
End Panel
Figure 12. Control Panel Relocated to End Panel
507789-02G / 31-5000673-1
208 Volt Conversion
1.
2.
Remove the air handler access panel.
3.
panel as a reference, move the 2 connected black
transformer leads from the 240 volt terminal on the
transformer to the 208 volt terminal on the transformer.
Figure 13. Converting Unit from 240VAC to 208VAC
Side
Issue 2336
208 / 240 VOLT TRANSFORMER
PRIMARY
SECONDARY
240 Volts
208 Volts
Page 13 of 24

Advertisement

Table of Contents
loading

Table of Contents