Advertisement

Quick Links

Installation
manual
HKD 12
©2023

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HKD 12 and is the answer not in the manual?

Questions and answers

Summary of Contents for Brunner HKD 12

  • Page 1 Installation manual HKD 12 ©2023...
  • Page 2: Table Of Contents

    BG Inner linings with deflector plate (D029035).................10 Installation frame (D029090-01)....................11 Door frame (D029100-01)......................11 Flue gas connection........................12 Assembly........................13 Setting of the HKD 12.........................13 Flue gas outlet..........................14 Installation of the combustion chamber..................16 Frame installation........................20 Drawings and technical data.................. 21...
  • Page 3: Basic Informations

    Fireplaces equipped with a water boiler must be pressure-tested after hydraulic connection to the heating system. Masonry work may follow only after this pressure test. Ulrich Brunner GmbH does not cover any costs incurred by necessary dismantling of masonry for rework at water boiler installation or replacement of the boiler.
  • Page 4: Delivery Contents

    DELIVERY CONTENTS The delivery consists of different packaging units depending on the configuration of the system. DESCRIPTION OF PARTS BODY HKD 12 (1.13) © 2023 Brunner GmbH...
  • Page 5 Im. 1: Front assembly © 2023 Brunner GmbH (1.13)
  • Page 6 Combustion air supply nozzle D016117 D029085 Lock 2 d125 D003239 Air adjuster mount D029080 Lock 1 D029032 Bottom assembly HKD 12 D029058 Blind cover Intermediate bottom assem- D029021 D003238 Handle of air supply adjuster D029010-01 Front HKD 12 D025107 Door hinge assembly bottom...
  • Page 7: Corner Door (D029022)

    BG CORNER DOOR (D029022) D029022-01 © 2023 Brunner GmbH (1.13)
  • Page 8 D029022-02 (1.13) © 2023 Brunner GmbH...
  • Page 9 I064027 02531 Hexagon screw M5x10 and door frame Sealing between door and I064035 D025041 Upper door hinge pin front I064079-01 Glass pane short D029070 BG Door handle with screws D029078 BG Door handle with screws © 2023 Brunner GmbH (1.13)
  • Page 10: Inner Linings With Deflector Plate (D029035)

    BG INNER LININGS WITH DEFLECTOR PLATE (D029035) Pos. Part.-No. Designation Pcs. D029043 Side wall stone front left-right D029042 Sidewall stone left-right D029037 Deflector plate 2 D029038 Deflector plate D029039 Rear wall stone D029041 Bottom plate (1.13) © 2023 Brunner GmbH...
  • Page 11: Installation Frame (D029090-01)

    INSTALLATION FRAME (D029090-01) DOOR FRAME (D029100-01) © 2023 Brunner GmbH (1.13)
  • Page 12: Flue Gas Connection

    Ø 200 mm 10087 (hood-assembly) Rotatable cast hood with nozzle Ø 180 mm low D016042 (hood-assembly) Spacer ring for MAS 440 10077 HKD 12 with MAS HKD 12 with cast hood: HKD 12 with cast hood: (1.13) © 2023 Brunner GmbH...
  • Page 13: Assembly

    ASSEMBLY SETTING OF THE HKD 12 We recommend to fix the adjustable feet on the ground. © 2023 Brunner GmbH (1.13)
  • Page 14: Flue Gas Outlet

    FLUE GAS OUTLET with cast hood with cast hood, low (1.13) © 2023 Brunner GmbH...
  • Page 15 Designation pcs. R009095-01 MAS cast hood assembly R009042 Two-piece spiral D444 2 assembly 10077 Spacer ring storage module- assembly Im. 2: Cut section trough HKD 12 with MAS Im. 3: Set on the spacer ring © 2023 Brunner GmbH (1.13)
  • Page 16: Installation Of The Combustion Chamber

    INSTALLATION OF THE COMBUSTION CHAMBER D029018 D029043 D029039 D029043 (1.13) © 2023 Brunner GmbH...
  • Page 17 D029042 D029042 Detail: D029041 © 2023 Brunner GmbH (1.13)
  • Page 18 Detail: D029038 Detail: D029037 (1.13) © 2023 Brunner GmbH...
  • Page 19 D029018 © 2023 Brunner GmbH (1.13)
  • Page 20: Frame Installation

    (X) and the eight fas- tening screws. To do this, align the frame with the grub screws and fix this setting by tightening the eight fasten- ing screws. Im. 6: Position of the grub screws (1.13) © 2023 Brunner GmbH...
  • Page 21: Drawings And Technical Data

    Dimension sheets - HKD 12 … mounting frame and cast iron dome low … door frame and cast iron dome Stand: 2023-12-20...
  • Page 22 … mounting frame and MAS Design characteristics for adjacent storage mass We suggest for CAD planning Palette CAD. Permanent updated drawings: www.brunner.de Frames/ flue gas outlet connection/ combustion air supply connection/ front variants/ support bearing are marked in col- Stand: 2023-12-20...
  • Page 23 Planning and installation - HKD 12 Tested according to EN 13229 W EN 13229 WA Values measured at Rated power Storage operation Suitable for all construction types according to rules Data for functional demonstration Rated heat power Fire wood volume...
  • Page 24 Technical and assortment changes as well as errors and Zellhuber Ring 17-18 misprints reserved. D-84307 Eggenfelden Reprinting and reproduction, even in part, only with the express permission of the publisher. Tel.: +49 (0) 8721/771-0 / Fax: +49 (0) 8721/771-100 Email: info@brunner.de Art.Nr.: 202566 (1.13) © 2023 Brunner GmbH...

Table of Contents