This document contains also information for the User of the heating system. Validity of these instructions This technical documentation is valid for the BRUNNER pellet heating BPH 7/25 und BPH 9/32 starting from October 2019. Ulrich Brunner GmbH reserves the right to introduce technical changes, as far as they serve for technical progress, or if they are required by technical safety provisions.
Appearance of on-screen display text in this manual For descriptions of settings performed on the BRUNNER Touch Display, the displayed text is shown as bold letters. For your safety 1.6.1 Dangers and safety measures Assembly, installation and maintenance may only be carried out by a specialist company.
1.6.5 Obligations of our Natural Power Partners To ensure the proper functioning of the BPH 7/25 und BPH 9/32 , observe the following guidelines: Perform works only if you have the necessary expertise. Perform only such activities, which are indicated or described in this manual.
Product description Intended use The BRUNNER pellet heating system BPH 7/25 und BPH 9/32 has been designed and constructed in accor- dance with the generally recognized rules of technology and the recognized safety regulations. The BRUNNER pellet heating system is intended for heating domestic hot water and drinking water in single or multi-family houses or commercial buildings.
Quality classes of the pellets The BRUNNER BPH pellet heating system may only be operated with wood pellets that comply with the DIN EN 14961-2/ A1 standard or the international DIN EN ISO 17225-2 standard and have a diameter of 6 mm.
Touch-sensitive display The BPH 7/25 und BPH 9/32 is equipped with a touch-sensitive display to make operation simple and easy to understand. The touch-sensitive display is a combination of input and output device, which enables direct control of regulatory functions by touching the screen itself or certain parts of displayed screen.
Exhaust gas test NOTES on preparatory activities: Clean the boiler approx. 3 days before the flue gas measurement by the chimney sweep. The boiler BPH 7/25 und BPH 9/32 has a chimney = Function = Function sweep Flue gas test Flue gas test button in the menu view.
Page 41
Note Ensuring heat dissipation In conjunction with the BRUNNER central heating system (BHZ) or with the BRUN- NER extension board Basic, if available also EWP heating circuits, all connected heating circuits are set to heat dissipation to ensure heat dissipation (regardless of whether they are enabled or not).
3. if the system or control panel is now running an update sequence? Please wait until finished and try again. Instructions for enabling Service access The access to service functions can be enabled exclusively for heating contractors or BRUNNER service technicians. Mutual access for both categories of servicemen is not possible.
Enabling for Service access To enable Service access for BRUNNER technicians or a heating contractor, the owner of the system must approve it first. This is done using a fixed Service PIN Code, which is defined in the User account.
Page 64
(purpose of release) please write your family name and location of the system. The system operator can revoke the tradesman or BRUNNER service’s access to the sys- tem at any time. Instructions for Use BPH 7/25 und BPH 9/32 (1.22)
The disabled time alignment is displayed with a gray box. The adjustment of the time or date with the BRUNNER network can be activated at any time. Data protection declaration of Ulrich Brunner GmbH...
Page 69
The required contact details can be found on the website: https://www.lda.bayern.de. If other sources of in- formation or services (websites, apps, etc.) from Ulrich Brunner GmbH are used, the data protection declara- tions listed also apply. Purpose of data processing We only collect, store and process personal data for the express or implicitly agreed purpose.
Cleaning and maintenance Regular maintenance of the boiler BPH 7/25 und BPH 9/32 ensures environmentally friendly operation of the system and extends its service life. Regular maintenance enables potential or emerging damage to be de- tected at an early stage and rectified. This increases the operational reliability of the heating system. At the same time, possible energy wastage is prevented.
Temporarily take the boiler out of operation CAUTION Possible damage to property due to frost If the boiler BPH 7/25 und BPH 9/32 is temporarily taken out of operation, there is a risk of frost damage. • Ensure that the boiler is not damaged by frost.
7.3.2 Disposing of boilers The boiler BPH 7/25 und BPH 9/32 and its accessories are largely made of recyclable materials. The body of a boiler is made of metal. Boilers also contain valves, seals with plastic and rubber parts and electronic components (e.g.
Need help?
Do you have a question about the BPH 7/25 and is the answer not in the manual?
Questions and answers