1.2 Notes 2. Safety instructions The symbols and notes below may appear in Electrical connection Grundfos installation and operating instructions, safety instructions and service instructions. WARNING Electric shock Death or serious personal injury Observe these instructions for explosion- ‐ Switch off the power supply before you proof products.
The green indicator light is Power on permanently on when the power is on. PM START is a pressure manager designed for automatic duty/standby control of Grundfos pumps or The green indicator light flashes other pumps for water supply in domestic...
4. Receiving the product 6. Mechanical installation 4.1 Inspecting the product 6.1 Position in the pipe system On receipt of the pressure manager, do the following: Install the pressure manager on the outlet side of the pump. 1. Check that the pressure manager is as ordered. The pressure manager can be fitted directly to the If the pressure manager is not as ordered, contact system manifold outlet port or between the manifold...
6.2 Installation height 7. Electrical connection The pressure manager can be fitted directly to WARNING the outlet port of the pump or between the pump and Electric shock the first draw-off point. Death or serious personal injury The arrows on the pressure manager indicate the ‐...
7.1 Wiring diagrams 8. Starting up the product The pressure manager automatically starts and stops the pump according to the pump's operating mode. The default operating mode is start/stop according to water consumption. 1. Make sure that the pump is primed. 2.
10. Fault finding 10.4 The pump does not stop Cause Remedy DANGER Electric shock A tap is open. • Close the tap. Death or serious personal injury Leakage in the pipes • Check and repair the ‐ Before starting work on the pump or higher than 1 liter/min.
1. Use the public or private waste collection service. 2. If this is not possible, contact the nearest Grundfos company or service workshop. The crossed-out wheelie bin symbol on a product means that it must be disposed of separately from household waste.
Page 22
BG: Декларация за съответствие на EO We, Grundfos, declare under our sole responsibility Ние, фирма Grundfos, заявяваме с пълна that the products PM START, PM1, PM2 & PM Twin, отговорност, че продуктите PM START, PM1, PM2 to which the declaration below relates, are in &...
Page 23
NL: EU-conformiteitsverklaring Sabiedrība Grundfos ar pilnu atbildību paziņo, ka Wij, Grundfos, verklaren geheel onder eigen produkti PM START, PM1, PM2 & PM Twin, uz kuru verantwoordelijkheid dat de producten PM START, attiecas tālāk redzamā deklarācija, atbilst tālāk PM1, PM2 & PM Twin, waarop de onderstaande norādītajām Padomes direktīvām par ES dalībvalstu...
Page 24
• RoHS Directives (2011/65/EU and 2015/863/EU). Standards used: EN IEC 63000:2018. This EU declaration of conformity is only valid when published as part of Grundfos installation and operating instructions. Bjerringbro, 23 November 2022 Steen Tøffner-Clausen Head of PD DBS Grundfos Holding A/S...
Page 25
UK declaration of conformity UK declaration of conformity We, Grundfos, declare under our sole responsibility that the products to which the declaration below relates, are in conformity with UK regulations, standards and specifications to which conformity is declared, as listed below:...
Page 26
Argentina China Greece Bombas GRUNDFOS de Argentina S.A. GRUNDFOS Pumps (Shanghai) Co. Ltd. GRUNDFOS Hellas A.E.B.E. Ruta Panamericana km. 37.500industin 10F The Hub, No. 33 Suhong Road 20th km. Athinon-Markopoulou Av. 1619 - Garín Pcia. de B.A. Minhang District P.O. Box 71 Tel.: +54-3327 414 444...
Page 27
Fax: +66-2-725 8998 Fax: + 370 52 395 431 Москва, RU-109544, Russia Turkey Тел. (+7) 495 564-88-00 (495) 737-30-00 Malaysia GRUNDFOS POMPA San. ve Tic. Ltd. Факс (+7) 495 564 8811 GRUNDFOS Pumps Sdn. Bhd. Sti. E-mail grundfos.moscow@grundfos.com 7 Jalan Peguam U1/25 Gebze Organize Sanayi Bölgesi...
Need help?
Do you have a question about the PM START and is the answer not in the manual?
Questions and answers