Riello RLAS 650-800 FGR 6 Installation, Use And Maintenance Instructions page 5

Conversion kit from /ev to /ev fgr operation
Table of Contents

Advertisement

2.2
Conversion
The burner is supplied in the configuration indicates in Fig. 2.
In order to convert the burner into the FGR operation, proceed as
follows:
Disconnect the electrical supply from the burner by
means of the main system switch.
DANGER
 remove the suction assembly 2) by uninstalling the air servo-
motor 1) and the fixing screws with the casing;
 from the suction assembly (A) remove the cover 1)(B) in order
to install the RLAS 650-800 FGR 6" suction assembly 2)(C)
code 20153157.
 The screws and the material for the fixing 3)(D) must be
installed as indicated in Fig. 3.
 Once the FGR unit has been fixed, you need to assemble the
suction assembly in the burner, fixing it to the casing with the
screws previously removed and re-assembling the servomo-
tor.
2.3
Installation of immersion probe
To install the immersion probe, proceed as follows (Fig. 4):
 remove the plug 1);
 install the probe 2) complete with the fitting.
Conversion kit from /EV to /EV FGR operation
2
1
3
1
A
C
GB
2
1
B
2
D
20157474
1 0
± 5
20157434
Fig. 2
20157443
3
Fig. 3
Fig. 4
20156844

Advertisement

Table of Contents
loading

This manual is also suitable for:

20153184

Table of Contents