Summary of Contents for BOERPLAY Water play Boracay with Pump
Page 1
Water play Boracay with Pump (Ground water (pulse) connection) PSTE800.001...
Page 2
0,00 m 0,00 m 1,76 m 2,34 m 2,59 m 2,68 m 2,71 m 3,05 m 2,78 m 2,85 m 3,86 m 4,87 m 5,02 m 5,42 m 2,30 m 1,30 m 1,20 m 0,84 m 1,00 m 0,58 m 0,51 m 0,30 m 0,50 m...
Page 3
4,84 m 8,54 m Opvangzone Impact area Obstakelvrije zone Obstacle free zone Benaming Watercombinatie TOE PST 800 001 Title Tekening Opmerking Adventure Play Drawing Comment Datum Obstakelvrije zone Obstacle free zone 20-12-2022 Date...
Page 4
0,52 m 0,65 m 1,45 m 2,16 m 1,59 m 0,83 m 2,66 m 0,51 m 0,87 m 1,00 m 0,50 m Benaming Watercombinatie TOE PST 800 001 Title Tekening Opmerking Adventure Play Drawing Comment Datum Bodemplan Groundplan 20-12-2022 Date...
Page 5
Typeplaatje Identification plate Let op pijlrichting A ( 1 : 5 ) Type Progr. Volgnr. Bew. Rev. Benaming Opmerking Watergoot 1,5 m Watergoot 2,5 m Watergoot 2,5 m Watergoot Recht 2,5 m Watergoot start 1,5 m Polyester waterbak Met opstap Pomp vlonder puls Zandrad Adventure Play...
Page 6
Supplied modules: Geleverde modules: See table Zie tabel Assembly instruction: Montageinstructie: - The main dimensions indicate the dimensions of the posts and floors - De hoofdmaten geven de maten van de staanders en vloeren aan - The detailed dimensions show the specific dimensions of the connections - De detailtekeningen geven specifiek de maten van de verbindingen aan Assembly sequence: Montagevolgorde:...
Page 7
2,30 m 0,50 m 0,10 m 0,10 m 0,00 m 0,34 m A ( 1 : 6 ) Benaming Watercombinatie TOE PST 800 001 Title Tekening Opmerking Adventure Play Drawing Comment Datum Modules Modules 20-12-2022 Date...
Page 8
LOGBOOK Type indication Adventure Play Article number PSTE800.001 Product Name Water play Boracay with Pump (Ground water (pulse) connection) Maximum fall height 0,6 m Construction year 2023 Certificate 066029 Inspection body TUV Nederland QA BV Ekkersrijt 4401 5692 DL Son...
LOGBOOK Inspection and maintenance Date of Time of Name Name Parts to be inspection inspection executor of executor of Found defects replaced maintenance maintenance inspection maintenance Accidents Date Age of Measures taken Probable cause of injury Occurred injury accident victim after accident...
Inspection and maintenance intervals months Nr. Inspection Maintenance between inspections Verify equipment's stability, junctions and Add missing parts, secure joints, apply missing parts. Inspect bolts, screws and nuts for missing fixing agent and replace absence, jams, corrosion and wear. corroded parts. Replace worn parts and/or remove non- Check suspension for wear.
Page 11
7. Remember that bad maintenance leads to unsafe conditions and notably faster impoverishment of the playground area. 8. Replacement parts can be ordered at the manufacturer with the OEM part numbers on the module drawing. Drawings can be found in the user guide. 9.
Page 13
A ( 1 : 8 ) B ( 1:6 ) Type Progr. Volgnr. Bew. Rev. Benaming Opmerking Draadeind+borgm.+ringen+dop M12, L= 140, RVS A2-70 BORGMOER M12 x 120 - RVS A2-70 Slotbout Sluitring M12 - RVS A2-70 Dop zwart Beschermdop M10-M12 70 mm Vierkante paal 700 mm Lengte Watergoot 2,50 m...
Page 14
A ( 1 : 4 ) Type Progr. Volgnr. Bew. Rev. Benaming Opmerking Draadeind+borgm.+ringen+dop M12, L= 200, RVS A2-70 Schroef Assy 5 x 70 - RVS A2-70 Schroef Assy 5 x 50 - RVS A2-70 Facet ring M5 - RVS A2-70 art.nr.80395000050 Vulring Paal 6...
Page 15
C ( 1 : 2 ) Type Progr. Volgnr. Bew. Rev. Benaming Opmerking Schroef Assy 4 x 25 - RVS A2-70 Schroef Assy 5 x 70 - RVS A2-70 M10 x 55 - RVS A2-70 Draadeind H = 38 m10 Draaiknop Ø...
Page 16
A-A ( 1:15 ) B-B ( 1:15 ) Benaming MOD PST 013 254 B Polyester waterbak Title Tekening Opmerking Drawing Comment Datum Samenstelling module Assembly module 11-9-2020 Date...
Page 17
0,37 m 0,81 m 0,31 m A ( 1 : 10 ) Type Progr. Volgnr. Bew. Rev. Benaming Opmerking Ring+Dopmoer + Slotbout 140 mm 1,5 m Watergoot Start Steunbok 1,70 m Watergoot Steunbok 1,80 m Watergoot Benaming MOD PST 013 248 Watergoot start Title Tekening...
Page 18
1570 1300 1300 Benaming Pomp vlonder puls MOD PST 013 255 Title Tekening Opmerking Met opstap Drawing Comment Datum Samenstelling module Assembly module 7-12-2022 Date...
Page 20
A ( 1 : 10 ) 2170 Type Progr. Volgnr. Bew. Rev. Benaming Opmerking BORGMOER M12 x 140 - RVS A2-70 Slotbout Sluitring M12 - RVS A2-70 Dop zwart Beschermdop M10-M12 Watergoot 2,50 m Een kant dicht Steunbok 0,80 m Watergoot Steunbok 0,60 m Watergoot...
Page 21
0,31 m 1,18 m 0,23 m Type Progr. Volgnr. Bew. Rev. Benaming Opmerking Ring+Dopmoer + Slotbout 140 mm Watergoot 1,50 m Een kant dicht Steunbok 0,60 m Watergoot Benaming Watergoot MOD PST 013 113 Title Tekening Opmerking 1,5 m Drawing Comment Datum Samenstelling module Assembly module...
Page 22
A ( 1 : 8 ) 0,44 m 1,78 m 0,21 m B ( 1:6 ) Type Progr. Volgnr. Bew. Rev. Benaming Opmerking Draadeind+borgm.+ringen+dop M12, L= 140, RVS A2-70 BORGMOER M12 x 120 - RVS A2-70 Slotbout Sluitring M12 - RVS A2-70 Dop zwart Beschermdop M10-M12 70 mm Vierkante paal...
Page 24
Met loctite vast zetten Type Progr. Volgnr. Bew. Rev. Benaming Opmerking SCHROEF 5 x 70 Schroef Assy 5 x 50 - RVS A2-70 Dopmoer M20 - RVS Sluitring M20 - RVS A2-70 D-sluiting 5 MM RVS Facet ring M5 - RVS A2-70 RVS-A2 Oogbout DIN580 M20x170 Paal 10-12...
Page 25
BOER PLAY Assembly manual for Hand pump HPOl This manual has been written to guide you in the assembly of the Mh2o hand pump type HP0l, suitable for sucking water from a borehole or water storage. Manuals for other Mh2o products can be found at www.mh2opompen.nl Preparation: In this installation manual we assume that the location of the pump is already fully...
BOER PLAY Installation: 1. Pull the piston rod out of the gray cylinder and pull the tie rod out of the blue riser on the male side. Connect the tie rod of the first riser to the piston rod of the pump cylinder and tighten securely using the two open-end wrenches.
Page 27
BOER PLAY 5. When the desired depth has been reached, clamp the riser to approximately 1.5 meters above the borehole / water storage. Now drill a hole in the riser about 1.2 meters below the end of the tube. This ensures that the pump drains automatically and can therefore never freeze.
Page 28
BOER PLAY 11. Now connect the tie rod to the operating handle by tightening the Allen screw through the hole in the housing. First, make sure the hole, handle and rod end are aligned. To do this, move the lever and with the pipe wrench the rod end until they are in front of the hole.
Need help?
Do you have a question about the Water play Boracay with Pump and is the answer not in the manual?
Questions and answers