Installation - Toshiba RAV-GE1301BP Series Installation Manual

Table of Contents

Advertisement

Available languages

Available languages

Installation under high-humidity atmosphere
In some cases including the rainy season, especially inside of the ceiling may become high-humidity atmosphere
(dew-point temperature: 23 °C or higher).
1. Installation to inside of the ceiling with tiles on the roof
2. Installation to inside of the ceiling with slated roof
3. Installation to a place where inside of the ceiling is used for pathway to intake the fresh air
4. Installation to a kitchen
In the above cases, additionally attach the heat insulator to all positions of the air conditioner, which come to
contact with the high-humidity atmosphere. In this case, arrange the side plate (Check port) so that it is easily
removed.
Apply also a sufficient heat insulation to the duct and connecting part of the duct.
[Reference]
Condensation test conditions
27 °C dry bulb temperature
Indoor side:
24 °C wet bulb temperature
Air volume:
Low air volume, operation time 4 hours
Installation space
Reserve sufficient space required for installation or service work.
Air discharge
Ceiling
2
5
2
5
A
B
100
or more
or more
Service door (Ceiling opening)
Floor surface
100 or more
Air discharge
Check port
450
B
Service space
(B for maintenance of air filter)
Model
A
GE130, GE180
750
GE240, GE300, GE360
1050
GE400, GE420, GE480, GE600
1450
Filter cleaning sign term setting
The lighting term setup of the filter sign (Notification of filter cleaning) of the remote controller can be changed
according to the condition of installation.
For setup method, refer to "Filter sign setting" in the Applicable controls of this Manual.
15-EN
1116950140_01_EN.indd 8
1116950140_01_EN.indd 8
(Unit: mm)
Air intake
Ceiling
50 or more
25
570
Service door (Ceiling opening)
Air intake
Ceiling
25
570
Service door (Ceiling opening)
Air intake
B
Ceiling
25
700
570
500
700
Service door (Ceiling opening)
4

Installation

CAUTION
Strictly comply with the following rules to prevent damage of the indoor units and human injury.
Do not put a heavy article on the indoor unit or let a person get on it. (Even units are packaged)
Carry in the indoor unit as it is packaged if possible. If carrying in the indoor unit unpacked by necessity, use
buffering cloth or other material to not damage the unit.
To move the indoor unit, hold the hooking brackets (4 positions) only.
Do not apply force to the other parts (such as refrigerant pipe, drain pan, foamed parts, or resin parts).
Carry the package by two or more persons, and do not bundle it with plastic band at positions other than
specified.
To install vibration isolation material to hanging bolts, confirm that it does not increase the unit vibration.
External dimensions
C
L
Hanging bolt pitch B
Main unit dimension A
External dimensions of flange C
D
Dimension
Model
GE130, GE180
GE240, GE300, GE360
GE400, GE420, GE480, GE600
– 8 –
(Unit: mm)
22
750
Hanging bolt pitch 650
5
0
5
0
345
187.5
355
415
570
Drain pan / Drain pump
check cover
A
B
C
700
765
640
1000
1065
940
1400
1465
1340
Electrical
control box
D
750
1050
1450
EN
ID
TH
16-EN
11/13/18 2:18 PM
11/13/18 2:18 PM