Download Print this page

Heathkit SG-8 Assembly And Operation Manual page 12

Hide thumbs Also See for SG-8:

Advertisement

( ) Mount the power transformer on top of the chassis opposite the audio choke.
i
I
2
3
©
,39OK
.0
5
II
2
2
YELLOW
SOCKET
330
1001
4
WHITE
I
BLACK
I
©
PICTORIAL 3
Page 10
i
II
I
I
I
Position the
transformer in such a manner that the red and yellow leads pass through the grommet near ­
est the chassis edge.
rflw
u.
20-20
MFD
I5OV
I
»
i'
I
TO
TA3
Tl
7 r
47.
•J
.
I
r
•I
I
o m.
■J
d
2
\U2
TAI &
ill
W
mfd
ML
^
II
\
IO
L
MF°
( ) Mount the sub-chassis to the chassis by inserting the sub-chassis spade bolts through the
small holes on either side of the large chassis cutout. Care must be taken to prevent dam ­
age to the E band coils at this time.
Lower the sub-chassis through the hole at a. slight
angle to clear the E band coils, and at the same time permit the band switch shaft to drop
down into the slotted hole in the front of the chassis.
( ) Mountthe audio choke on top of the chassis to the rear of the tube socket. Use 3/8 6-32
screws, placing a solder lug under the nut nearest the tube socket and the lockwasher under
the other nut. Position the solder lug as shown in Figure 6.
l
6B0,
33K
-IW
©
( ) On the back mounting screw of the transformer, place a solder lug on the under side of the
chassis.
Position as shown in Figure 6.
( ) On the front mounting screw, mount a 2-lug terminal strip TC. Position as shown in Figure
6. Use a lockwasher under the nut.
( ) Using 3/8 6-32 screws, mount a solder lug at hole H and a 3-lug terminal strip TB at hole
J, using a lockwasher on the latter. Position as shown in Figure 6.
3
2*

Advertisement

loading