Confirm Power Supply; Prevent Mutual Interference Via Power Supply; Confirm Power Cord - Saluki SMR Series Quick Start Manual

Monitoring receiver module
Table of Contents

Advertisement

Confirm power supply

Mainland China must meet:
 Voltage:AC220±10%
 Frequency:50~60Hz

Prevent mutual interference via power supply

To prevent multiple devices, especially instruments and high-power equipment
from being connected to the same power grid, the pulse interference generated by
high-power equipment will cause the instrument to work abnormally or even be
damaged. It is recommended to use an AC regulated power supply to power the
instrument.

Confirm power cord

The instrument uses a three-core power cord interface, which complies with
national standards. You must confirm that the power protective ground wire is
reliably connected to the earth. Floating ground or poor grounding may cause damage
to the instrument. It is strictly prohibited to use power cord without protective ground.
Before turning on the power, make sure the power cable is in good condition and
complete. Use the power cord to connect the instrument power plug and a well-
grounded three-core power socket.
SMR Series Monitoring Receiver Module Quick Start Manual
6 / 11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smr018Smr080

Table of Contents