Safety Warning
The installation should be carried out
by a qualified electrician in compliance
with the current edition of the IEE
Wiring Regulations.
Prior to installation, carry out the
necessary risk assessment considering
the people who could be at risk,
the level of risk and the precautions
required to control the risk
Ensure that the circuit supply is
isolated either by the circuit supply
fuse being removed or the applicable
Specification
Box Contents -
1 x Maintained/Non-Maintained 230V Emergency Bulkhead, /ST Version
with Self Test Functionality
1x Self-Adhesive Exit Legend
Dimensions:
L: 351 x W: 111 x D: 63mm
Body: ABS
Material:
Lens: Polycarbonate
Colour
6500K
Temperature:
LED Lifetime:
L70B50 36,000 Hrs
IP Rating:
IP65
IK Rating:
IK06
Working
0°C to 45°C
Temperature:
Guarantee:
5 Years
5
3
YRS
WATT
GUARANTEE
Installation Instructions
1.
Isolate the mains supply before carrying out any installation or maintenance work.
2.
Remove the diffuser/lens from the fitting by loosening the screws at either end.
3.
Access the terminal block & batteries by pushing the 2 retaining clips outwards and rotate the gear tray on its hinge as shown.
2
INSTALLATION INSTRUCTIONS
Vanguard Emergency Bulkhead (/ST Version with Self Test)
Product Codes: VAN/3 & VAN/3/ST
IP65
6500K
circuit breaker being turned off before
installation or any maintenance.
Check the total load on the circuit
ensuring the luminaire does not exceed
the rating of the circuit cable, fuse or
circuit breaker.
Long-term use and voltage fluctuations
can reduce the life span of the fitting.
If the fitting incorporates control gear,
ensure careful sizing to avoid instances
of nuisance tripping of the protective
device used in the installation.
LED
230V
3
Follow the provided installation
instructions, using the fixings supplied
or recommended.
Keep out of reach of children.
L351mm
SELF TEST
(Self Test Version Only)

Advertisement

loading
Need help?

Need help?

Do you have a question about the VAN/3 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Red Arrow VAN/3

  • Page 1 INSTALLATION INSTRUCTIONS Vanguard Emergency Bulkhead (/ST Version with Self Test) Product Codes: VAN/3 & VAN/3/ST Safety Warning • • The installation should be carried out circuit breaker being turned off before Follow the provided installation by a qualified electrician in compliance installation or any maintenance.
  • Page 2 11. Leave the power connected for 24-36 hours to fully charge the batteries and then carry out an emergency commissioning test. Self Test Version Only VAN/3/ST features stand alone automatic self test operation. After the power supply has been connected and the batteries have charged for 24 hours, the fitting will perform the following tests automatically, which meet and exceed legal requirements.
  • Page 3 When this fitting comes to the end of it’s life or you choose to replace it, please do not dispose of it with your normal waste. Please recycle where the facilities exist, check with your local authority for suitable options. INS_EMERGENCY_0016_VAN_V4 Red Arrow Electrical Ltd T: 0800 195 0006 redarrowelectrical.co.uk Cortonwood Drive, Brampton, sales@redarrowelectrical.co.uk...
  • Page 4 Result / Signed Date Signed Date Signed Date Action Action Action Functional Functional Functional Functional Functional Functional Functional Functional Functional Functional Functional Full Duration INS/EMERGENCY_TESTING_SHEET/V2 Red Arrow Electrical Ltd T: 0800 195 0006 redarrowelectrical.co.uk Cortonwood Drive, Brampton, sales@redarrowelectrical.co.uk Barnsley, S73 0UF...

This manual is also suitable for:

Van/3/st