Ecotechnics SUN ECK TWIN 12 User Manual page 33

”two-in-one” — the complete stations for r134a and hfo1234yf
Table of Contents

Advertisement

If the UV function is installed, the quantity of UV set by the operator will be automatically
reintegrated.
When completed, the system will go on to charging with the preset quantity of refrigerant.
Then the following screen will be displayed.
Disconnect HP coupling. Start A/C system with LP coupling connected, press ENTER
The A/C system will recover the refrigerant into the service hoses, then the following screen will
be displayed:
INSTRUCTIONS MANUAL
OIL INJECTION
OIL INJECTION
CHARGE
Gas charged:
Tank Pressure
A/C pressure
Tank Temperature
Disconnect HP coupling Start A/C system with LP
coupling connected end press ENTER
-34-
DD/MM/YY XX:XX PM
STOP
OIL INJECTION
0
ml/ 0%
DD/MM/YY XX:XX PM
STOP
UV INJECTION
0
ml/ 0%
DD/MM/YY XX:XX PM
86g / 100 g
6.6 bar
STOP
2.9 bar
25.5 °C
DD/MM/YY XX:XX PM
ENTER

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun dual gas 12

Table of Contents