Download Print this page
Energy SE 5KTL-D3/G2 Quick Installation Manual
Energy SE 5KTL-D3/G2 Quick Installation Manual

Energy SE 5KTL-D3/G2 Quick Installation Manual

Three-phase grid-tied pv string inverter 5k-30k
Hide thumbs Also See for SE 5KTL-D3/G2:

Advertisement

Quick Links

QUICK INSTALLATION GUIDE
INSTALLATION LOCATION
≤��℃
≥-��℃
≤���%
%
INSTALLATION
�. The walls must be fireproof and non-flammable materials, otherwise there is a fire risk.
�. Before drilling holes, check whether there are electric power pipes or other pipes buried in the walls to avoid risks.
Set bracket horizontally.
Ø:��mm; Depth: ��mm
Mark the holes position
on the wall.
Drill the holes.
A & B
M�
�.�N·m
Install the inverter.
GROUNDING
�. According to regulations, the secondary protection grounding can' t replace the PE terminal connection of
the AC cable. Ensure that both are grounded reliably.
�. Ensure that inverter and all cables to be installed are completely powered off during whole installation and
connection. Otherwise, fatal injury can occur due to the high voltage.
Three-phase Grid-tied PV String Inverter
�K-��K
���
���
���
���.�
A
Expansion screw group
(M�;� sets)
Install the expansion tubes.
Tighten the screws at both sides.
Items
Remark
Screw
M� X ��mm; �.� N
m
·
OT Terminal
OT�-�(�K-��K);
OT��-�(��K-��K)
S
S
Yellow green lines
(Yellow green lines)
(PE line of AC cable)
S
is the cross-sectional area.
Ensure that the grounding resistance is less than
��Ω.
AC CONNECTION
���mm(Recommended)
A
��
�
B
It is recommended to use outdoor dedicated cables with multiple copper cores.
No. Name
Model �K-��K ��K-��K ��K-��K ��K
Wire outer diameter
A
(mm)
Range
Cross-sectional
B
area (mm²)
Recommended
Wires making.
Unit:mm
AC terminal inserting pieces
This operation is
only required for
��-��K models.
B
C
D
C & D
(Only take ��K model as an example in appearance)
Lock the AC cable to the corresponding AC terminals.
PV CONNECTION
�.Photovoltaic arrays exposed to sunlight will generate dangerous voltages!
�.Before connecting the DC terminal, ensure that both the AC terminal and the DC terminal
are powered off and the DC switch is OFF. Otherwise there is a risk of high voltage shock.
8~10mm
� x M� screw; �.�N
m
Diameter
·
8~10mm
5~8mm
Tighten the waterproof nuts on
each connector with a wrench
to avoid loosening.
DC cable should be dedicated PV cable (suggest using �~�mm² PV�-Fcable).
Note:
Before connecting the AC terminal, ensure that both the AC terminal and the DC terminal are
powered off and the DC switch is OFF. Otherwise there is a risk of high voltage shock.
L+�mm
L
��-��
��-��
��-��
��-��
�-�
�-��
��-��
��-��
��
��
��
Wires threading and pressing.
D
L� L� L�
N
PE
Screw Torque
D
M�
�.�N
m ��mm
�K-��K
·
M�
�N
m ��.�mm
��K-��K
·
➀Align the AC cover with the � holes and tighten it
firmly with � x M� screws.
➁Fasten the nut (waterproof cap).
Positive Connector
Limit buckle
Negative Connector
Use crimping tool to
stitch. Limit buckle
can't be crimped.
��
~
~
~
~
Test string voltage and confirm string polarity
Heat shrinkable tube
Nut
Torque
M��
�.�N
m
�K-��K
·
M�� ��N
m
��K-��K
·
➀ � x M� screws;�.�N
m
·
Click
Ensure that the DC switch is OFF

Advertisement

loading

Summary of Contents for Energy SE 5KTL-D3/G2

  • Page 1 QUICK INSTALLATION GUIDE Three-phase Grid-tied PV String Inverter AC CONNECTION �K-��K � Before connecting the AC terminal, ensure that both the AC terminal and the DC terminal are INSTALLATION LOCATION ��� powered off and the DC switch is OFF. Otherwise there is a risk of high voltage shock. �...
  • Page 2 RS��� CONNECTION Go to Console > Communication Setting > RS��� Setting > Modbus Page, check the Modbus address (the default value ➃ is �), and click to modify the address as required if necessary. � XXXXXXXX XXXXXXXX Communication Setting RS��� Setting �.��Wh �.��kWh Maintenance...