No.
Component
1
AC switch
3.2
Installing the PE Cable
Do not connect the neutral wire to the enclosure as a PE cable. Otherwise, electric shocks may
occur.
•
The PE point at the AC output port is used only as a PE equipotential point, and cannot
substitute for the PE point on the enclosure.
•
Silica gel or paint must be applied around the ground terminal after the PE cable is connected.
•
It is recommended that the right ground point be used for grounding. The other ground point
is reserved.
3.3
Installing a WLAN Antenna or Smart Dongle
•
If FE communication is used, install a WLAN-FE Smart Dongle (SDongleA-05). You need to
purchase the WLAN-FE Smart Dongle by yourself.
•
If 4G communication is used, install a 4G Smart Dongle (SDongleA-03). You need to
purchase the 4G Smart Dongle by yourself.
Description
Recommended: a
single-phase AC circuit
breaker
Source
Rated voltage ≥ 250 V AC
Rated current:
•
16 A (SUN2000-2KTL-L1)
•
25 A (SUN2000-3KTL-L1 and SUN2000-
3.68KTL-L1)
•
32 A (SUN2000-4KTL-L1, SUN2000-
4.6KTL-L1, SUN2000-5KTL-L1, and
SUN2000-6KTL-L1)
Ground
point
Antenna port (ANT)
Smart Dongle port (4G/FE)
5