Page 2
CONTENTS 1. Assembly Advice ..............Page 1 2. Product Features ..............Page 2 - 3 3. Parts List ................Page 4 - 8 4. Roof Vent Assembly ............Page 9 - 10 5. Door Assembly ..............Page 11 - 13 6. Base Assembly ..............Page 14 - 15 7.
Page 3
Assembly and Maintenance Advice 1. For safety purposes, we strongly recommend that this product is assembled by at least two people. 2. Some components have sharp metal edges. Please be careful when handling metal components. Please wear gloves, shoes and safety goggles during assembly. 3.
Functions and Features: 1. Compared with traditional greenhouses this new product features many significant improvements. The hollow box profile aluminium framing is much stronger than other greenhouses and it can withstand much greater pressure. 2. Base anchor brackets are included as standard with expanding bolts to ensure a secure fixing into concrete or paving.
Page 5
5. Manual window handles are included as standard with the roof vents. If required, automatic roof vent openers are available as an inexpensive optional extra. Automatic Opener Manual Opener Auto-Opener is sold separately 6. Remove approximately 2 inches of film from all sheet edges before installing and remove all film immediately after the construction is completed.
Page 9
GE4506 (PC / Glass ) This page is for all PC or all glass. PART PART 218M PC / Glass No. 1 PART PC / Glass No. 2...
Page 10
(PC + Glass ) GE4506 This page is for PC + glass. PART PART PART 152M Glass...
Page 11
PART Window L19A L19B M4.2X16 L19A L19A L19B Fix A01 in the middle of L19B, 322.2mm from the ends. Insert H43 into the Slot Slot of L19A,L19B & L20 Insert Part B into the tube L19B Tube of L19A,L19B & L20 After connector D46 &...
Page 12
PART PART 2.65M J107 L15A L15A M4.2X16 Ø4X16D J107 If glass is chosen, please seal it with rubber (J107) provided. If polycarbonate sheet is chosen, rubber is not provided. Please seal it with silicone sealant (not provided).
Page 13
PART Left Door L18A L16A L16B L18A L05G L18B L16B L18C L18D L18D L05G M5X12 L05G M4.2X16 M6X12 L18B Insert Connector D45 into each end of frame profiles L16B & L18A & L18B & L18D, and then fix them with screws Z08. Before fixing with screws, please mark them with a pencil at distance about 20/30mm from each end, and make sure there is no gaps...
Right Door L18B L05G L18C L16A L05G L18A Insert Connector D45into each end of frame profiles L16A & L18A & L18B & L18C, and then fix them with screws Z08. Before fixing with screws, please mark them with a pencil at distance about 20/30mm from each end, and make sure there is no gaps between each profile.
Page 15
PART 12.8M J107 J107 J107 If glass is chosen, please seal it with rubber(J107) provided. Noted: Rubber is not provided if you choose polycarbonate sheet as glazing panel.
Page 16
Expansion screw/Concrete ground *It is essential the dimensions a + b are the same to ensure the base is square. Steel pegs in soil Support at the corners only is inadequate.
Page 17
PART 4332.4MM (Outer) 4282.4MM (Inner) M8X60 2478.2MM (Inner) 2528.2MM (Outer) Door Door * This shows a layout for D22's positions where it is placed in the middle of glazing panel for each section.
Page 20
PART L03C L03E L03F L20A L03F L03C L03C L20B L03E L03E M5X12 L03F L20B L20A L20A&B L03C&E&F L08A L08A Fix L20A & L20B to L08A, using S26. Fix L03C, L03E & L03F to L08A on the other side as shown, using S26.
Page 21
PART L07B L07D L07B J132 L07B M5X12 J132 L07D J132 L07D L07D L07B L07B L07B L27A Fix L07B to L27A, using S26. L07B&D L01A&B Fix L07B & L07C&L07D to L01A/L01B, using S26. J132 L07B L07B...
Page 22
PART Fix two ends of L05A to L01A/L01B using S26. L05A Fix L05A to L03C, L03E & L03F with Z08,using a powered screwdriver. Eusure that L05A is fixed at a right angle L05B (90 degrees) to the glazing bars. L05D L05A M5X12 L05B...
Page 23
PART L02E L02E L03A L04A L03D L04A L02E L02E M5X12 L02E M4.2X16 Fix L04A to L20A & L02E L20B, using S26. L05A&D Install L02E (6PCS) L04A Insert the other end of Y5 into the channel of L02E, and then fix them to Aligned overlap L05A/L05D, using Z08.
Page 24
PART L05H M4.2X16 L05H L05H L05H L05H L05H...
Page 25
PART Slide the glazing panel Y1, Y2, Y3 L01C and Y4 into positions L01D M5X12 1. Fix L01C/L01D to L07B/L07C/L07D with plate D48, using S26. L01D 2. Fix L01C to L01D with plate L01C D48, using S26 L01C 3. Fix L01C & L01D to L01D L20A &...
Page 26
PART 113M J107 J107 If glass is chosen, please seal it with rubber(J107) provided. J107 J107 L02A...
Page 27
PART L06B M4.2X16 L06B L06B double holes L06B 300MM L06B 280MM L29 is 600mm length, insert 300mm of L29 into L06B, leave another 300mm of L29, then fix L06B & L29 on the distance 180mm & 280mm away from the edge of L06B, using 4xZ08. Install another L06B &...
Page 28
PART L06C L27B L27B L28A L06B D146 L06B D144 L28A D146 D144 M5X12 L06C M4.2X16 M6X12 L27B D146 L06B&D L06B L06B L28A L28A S05/M03 L28A L06D 1.Fix L06B&D to L01C&D with plate D48, using S26. D144 2.Fix L06B, L28A & L27B to plate D146, using S26. Fix L06D to plate D146, using S05/M03.
Page 29
PART L03G L03H L03H L03G D145 D145 M5X12 Put Y17 & Y18 into position. 1.Fix L03G&H to L28A with plate D145, using S26. 2.Put Y15 & Y16 into position.Fix L03G&H to L06B&D, using S26. L03G L03H D145 L03G&L03H L03G&H L03G&H D145 D145...
Page 30
PART L03B L03K L05B L03K L05D L05D L03K L05D M5X12 L05D Fix L03B &L03K to the eave profile and roof profile as shown, using S26. L03K L28B L03K L03K L05B L05D L05B L03B L03B Fix L05B&C&D as shown, using S26. L03B&L03K L01C&L0D L03B...
Page 31
PART WINDOW L06D L06B WINDOW M5X12 WINDOW M4.2X16 WINDOW Firstly, insert Y8 into the channel of roof glazing bars and push it up into the channel of L06B/L06D. Secondly, install the windows. Put the other end of Y8 into the channel of L11 (on the window) and then fix it to L02B/L02K with D49, using S26 &...
Page 32
PART Panels assembly L02F M4.2X16 M5X12 L02F L03B L02F L02F 1.Put Y9 & Y7 into positions. 2.Fix L02F to L03B & L03K with D49, using S26 & Z08, make sure the window can be opened & closed normally.
Page 33
PART PART 53.8M L09B J107 Gutter Assembly L09E L09F M4.2X16 M6X12 L09E L09F L09F L09E When the panels are completely inserted, fix gutter LO9B/C/ID/E/F to profile LO7B/C/D. Tap it gently into position with a rubber mallet. L09B...
Page 34
Fix D25 to L09B , using S05 and M03. L07B&C&D&E&F L09B&C&D&E&F When the panels are completely inserted, Fix A03 to L02F using Z08, fix gutter profileL09B&C&D&E&F. adjust its position to fix for A01 Tap it gently into position with a rubber mallet. before you tight up Z08.
Page 35
PART Auto Opener assembly (Optional) D115 Please follow these steps if Auto Opener is needed. M4.2X16 L02F D115 L02F D115 Fix D115 onto L02F, using Z08; and fix the auto opener onto D115 and L19B (window profile), using Z08.
Page 36
PART L03I L03I D149 D148 L03J D147 L03J D147 D148 L28B D149 M5X12 D149 L27B 1.Fix D147 & D148 to L28B, using S26. L03I Fix D149 to L27B, using S26. L03I 2.Fix L03J to D147 & D148, using S26. Fix L03I to D147, D148 & D149, using S26. D148 L03J L28B...
Page 37
PART L05E M4.2X16 L05E L05E Fix L05E into position as shown, using Z08. L05E...
Page 38
PART Fix A51(4 PCS) one side on the door profile and the other side on L20A/L20B using S27. M4.8X16 Then secure with Z17. M5X12 Left Door Right Door...
Page 39
PART J37R J37L M4.2X16 Ø4X16D J37R/L If you wish to eliminate leaks Drill a hole in L01A/L01B, use glue when fixing the downpipe approximately 3mm diameter and 700mm bends (not provided). up from the bottom. Fix the J92 downpipe bracket with Z08 screws and then clip the L25 downpipe into the J92 bracket.
Need help?
Do you have a question about the GE4506 and is the answer not in the manual?
Questions and answers