CONTENTS 1. Assembly Advice ..............Page 1 2. Product Features ..............Page 2 - 3 3. Parts List ................Page 4 - 6 4. Roof Vent Assembly ............Page 7 - 8 5. Door Assembly ..............Page 9 - 11 6. Base Assembly ..............Page 12 - 13 7.
Page 3
Assembly and Maintenance Advice 1. For safety purposes, we strongly recommend that this product is assembled by at least two people. 2. Some components have sharp metal edges. Please be careful when handling metal components. Please wear gloves, shoes and safety goggles during assembly. 3.
Page 4
Functions and Features: 1. Compared with traditional greenhouses this new product features many significant improvements. The hollow box profile aluminium framing is much stronger than other greenhouses and it can withstand much greater pressure. 2. Base anchor brackets are included as standard with expanding bolts to ensure a secure fixing into concrete or paving.
Page 5
5. Manual window handles are included as standard with the roof vents. If required, automatic roof vent openers are available as an inexpensive optional extra. GM80002 Manual Opener Automatic Opener 6. Remove approximately 2 inches of film from all sheet edges before installing and remove all film immediately after the construction is completed.
Page 7
GE2604 (ALU Box No. 2) PART DOOR L02E WindowX2 PART L03B PART L03C L16A L19A L03D L16B L19B L03E L06A L18A L05C L18B L15A L05E L18C L18D L05G L03A...
Page 8
GE2604 (PC/Glass Box No. 1) PART PART 160M Rubber for walls & roof (Provided for glass only) PC/Glass PART N0.1 Rubber for walls only (Provided for glass only)
Page 9
PART Window L19A L19B M4.2X16 L19A L19A Fix W06 in the middle of L19B, L19B 322.2mm from the ends. Insert W07 into the Slot Slot of L19A,L19B & L20 Insert Part B into the tube L19B of L19A,L19B & L20 Tube 20MM After connector B &...
Page 10
PART PART 2.65M L15A L15A M4.2X16 Ø4X14D If glass is chosen, please seal it with rubber(J11) provided. Rubber is not provided if you choose polycarbonate sheet as glazing panel.
Page 11
PART Left Door L18A L16A L16B L18A L05G L18B L16B L18C L18D L18D L05G M5X12 L05G M4.2X16 M6X12 L18B 20MM 30MM Insert Connector A into each end of frame profiles L16B, L18A, L18B & L18D, and then fix them with screws Z01. Before fixing with screws, please mark them with a pencil at distance about 20/30mm from each end, and make sure there...
Page 12
Right Door L18B L05G L18C L16A L05G L18A 20MM 30MM Insert Connector A into each end of frame profiles L16A, L18A, L18B & L18C, and then fix them with screws Z01. Before fixing with screws, please mark them with a pencil at distance about 20/30mm from each end, and make sure there is no gaps between each profile.
Page 13
PART 12.2M If glass is chosen, please seal it with rubber(J11) provided. Noted: Rubber is not provided if you choose polycarbonate sheet as glazing panel.
Page 14
10mm Expansion screw/Concrete ground It is essential the dimensions a + b are the same to ensure the base is square. Steel pegs in soil Support at the corners only is inadequate.
Page 15
PART M8X60 4360MM Expansion bolts assembly 4310MM 10mm * This shows a layout for W05's positions where it is placedin the middle of the glazing panel for each section.
Page 16
PART L08A L08B L08B L08A M5X12 L08A L08B Insert J02 into the tube of L08A and L08B L08B L08A L01A L01A L01A L01A L01A Fix L01A to L08A & L08B through J02, using S01.
Page 17
PART L07A L07B M5X12 L07B L07A L07A L07B Insert J01 into L01A, and then fix L07A & L07B to L01A using S01. Make sure the angle is Right Angle before tighting them up. L07A L07B...
Page 18
PART Back Wall Assembly L03A M5X12 L03A L03A L03A L03A L03A Insert Panel Y5 into the channel of L01A, and then fix a L03A to L08B & L07B using S01. Make sure the other side of Y5 is completely in the channel of L03A. L08A Insert another Y5 into the channel of L03A, then fix another L03A using S01.
Page 19
PART L03A M5X12 L03A L03A Side Walls Assembly Do the same as the back wall assembly, L07A Y6 is the last panel to insert in. L03A L08A L03A...
Page 20
PART Front Wall Assembly L04A L04B L03A L03A L05C L03A M5X12 L04B M4.2X16 L04A L07A L03A Fix L03A and Y5 same as the back wall assembly. Fix L04A & L04B using S01. L03A And then fix L05C to glazing bars L03A & L04A/L04B L08A using S01.
Page 21
PART L05A L05B L05B M5X12 M4.2X16 L05A L05A L01A L01A L05A L05A Install L05A (2PCS) & L05B Fix two ends of L05A/L05B onto L01A using S01, Fix L05A/L05B to L03A with the self-tapping screws (Z01) using a powered screwdriver. Eusure that L05A/L05B is fixed at a right angle (90 degrees) to the glazing bars.
Page 22
PART L02E M4.2X16 L02E Aligned overlap L02E L05A Install L02E (2PCS) Insert the other end of Y6 into the channel of L02E, and then fix it to L05A, using Z01. Make sure L02E and L05A must be aligned.
Page 23
PART WINDOW M5X12 M4.2X16 1. Fix W03 onto the window profile L11 using S01; 2. Make a mark on L03A at distance 643MM from L02E (as shown on the left). Do the same on the other end. 3. Fix the window to L03A, using Z01. 4.
Page 24
PART If glass is chosen, please seal it with rubber(J11) provided.
Page 25
PART L23A L03D M5X12 L03D L23A L03D Fix L23A (2PCS) and L03D (2PCS) to W25 as shown above, using S01. L23A L03D L23A L03D L23A Fix the roof profiles L23A to L07A & L07B, with W21, using S01. Fix L03D to L07A & L07B, using S01. Note: Extra hands are needed to hold the profiles when you do this assembly.
Page 26
PART L06A L03D L03D L03E L06A L03E L03D M5X12 Fix L06A to L23A & L03D with J03,using S01 L03D L03D L07A L06A L03E L07B L03E L06A L03E Fix L03E to L06A and L07A, using S01.
Page 27
PART PART L03B L03C L09A L03B L03C L09B M5X12 L03B&L03C L03B&L03C Insert Y1/Y2 into the right position before fixing L03B /L03C. Y1&Y2 If glass is chosen, please seal it with rubber(J11) provided.
Page 28
Y8 Y8 Y3 Y8 Y8 Y4 Put Y3, Y4 and Y8 into positions...
Page 29
Gutter Assembly L09B When the panels are completely inserted, fix gutter profile L09B. Tap it gently into position with a rubber mallet. Do the same on the other side. L07A L09B Y1 Y3 Assembly the other 2 sides. Firstly, put Y1 & Y2 into positions, and fix L03B & L03C to L23A & L07A; Secondly, put panel Y3 &...
Page 30
PART L05A L05C L05A L05E L05E L05C L05E M4.2X16 L05E M5X12 L05C L05A L05E L05E L05E L03D L03B&L03C L03B&L03C L05C L05C Fix L05A&L05C to L03B & L03C using S01, and fix it to L03D using Z01. Fix the eave bracing L05E using Z01 as shown.
Page 31
PART L05A L05C L05A L05E L05E L05C L05E M4.2X16 L05E M5X12 L05C L05A L05E L05E L05E L03D L03B&L03C L03B&L03C L05A/L05C Fix L05A&L05C to L03B & L03C using S01, and fix it to L03D using Z01. Fix the eave bracing L05E using Z01 as shown.
Page 32
PART Door Assembly M4.2X16 M4.2X16 M5X12 Fix L24 to L07B, using Z01. Left Door Right Door Fix L25(4 PCS) one side to the door profile and the other side to L04A/L04B using S02. Then secure with Z03.
Page 33
PART M4.2X16 If you wish to eliminate leaks Drill a hole in L01A, use glue when fixing the downpipe approximately 3mm diameter and 700mm bends (not provided). up from the bottom. Fix the J08 downpipe bracket with Z01 screws and then clip the J06 downpipe into the J08 bracket.