Download Print this page

D-Flector D600 Installation Manual page 5

Advertisement

D600
DSG045
Step 3
Fit Rear Mounting Square Tube Assembly (14) to trailer chassis using the two square U bolt
(15) M12(140T) x 41(W) x 270(L) and Lower Mounting Plate (16). Make sure that a Rear
Mounting square Tube assembly position is at equal distance from front, so that at both side
of the Boat chassis, Stone guard will remain symmetric.
Warning:- Ensure any cables running along or under the chassis are not interred with
14
Bolt
16
15
Figure 1
Keep appropriate and same gap on left- and right-hand side of chassis to
keep minimum 100mm gap between Gunnel and
upper Rear end of the Stone Guard.
5

Advertisement

loading

This manual is also suitable for:

Dsg045