7- Pre-Installation Information - MAKFRY pan 202 User Manual

Table of Contents

Advertisement

7- PRE-INSTALLATION INFORMATION

INSTALLATION MUST BE DONE BY AN AUTHORIZED TECHNICIAN ACCORDING TO THE INSTRUCTIONS
AND REGULATIONS. OUR COMPANY CANNOT BE LIABLE FOR ANY DAMAGES DUE TO INCORRECT
INSTALLATION.
IF THE PRODUCT FAILS, TURN OFF THE PRODUCT. ONLY A SERVICE AUTHORIZED BY THE
MANUFACTURER MUST PROVIDE THE PRODUCT.
FAULTS MUST BE REPLACED WITH ORIGINAL SPARE PARTS. THE PARTS LIST IS ALSO STATED IN THE
BOOKLET.
THE FLOOR ON THE PRODUCT MUST BE FLAT. NECESSARY PRECAUTIONS MUST BE TAKEN AGAINST
THE RISKS OF THE PRODUCT TO TURNOVER.
THE PRODUCT MUST BE CONNECTED TO THE MAIN NETWORK BY AN AUTHORIZED ELECTRICAL
TECHNICIAN ONLY IN ACCORDANCE WITH THE LAW AND REGULATIONS. MAKE SURE THAT THE
POWER FROM THE MAIN NETWORK WILL MATCH THE POWER OF THE PRODUCT. MAKE THE
GROUND CONNECTION OF THE PRODUCT ACCORDING TO THE STANDARDS AND SAFETY RULES.
GROUNDING OF THE PRODUCT MUST BE CONNECTED TO THE EARTH LINE ON THE NEAREST PANEL
OF THE ELECTRICAL INSTALLATION. THE PRODUCT ELECTRICAL CONNECTION, MAIN FUSE AND
LEAKAGE FUSE MUST COMPLY WITH THE APPLICABLE REGULATIONS AND RULES.

Advertisement

Table of Contents
loading

Table of Contents