Install an expansion vessel with a safety valve in the hydraulic circuit. The hydraulic circuit must be sized according to the
applicable laws in force.
Supply
RU
RU
MF
RU
OBLIGATION:
Maximum operating pressure 10 bar, including the hydrostatic head – PN 10.
4.4.1.1
Hydraulic connections
MODEL
HYDRAULIC CONNECTIONS
Inlet / Outlet
Inlet / Outlet (1)
MODEL
HYDRAULIC CONNECTIONS
Inlet / Outlet
Inlet / Outlet (1)
(1) Grooved connection
(*) Referring to the manifold
4.4.2

Installation technical notes

The connection pipes must be suitably supported so that they do not weigh down on the machine.
Avoid rigid connections between the machine and the pipes, and install vibration dampers.
For temperatures values, minimum and maximum water flow rates and the volumes of water in the heat exchanger
water circuit, refer to the Data Book.
Any heating elements installed to prevent the pipes from freezing must be kept away from devices, sensors and
materials that the heating elements could damage or cause to malfunction (for example, temperature sensors, plastic
components and power cables).
The carrier fluid in the water circuits must be prevented from flowing in the reverse direction as this can damage the
pumps or cause by-passes, affecting the flow and temperature of the system.
Install suitable devices to ensure the correct fluid flow rate even with one or more machines switched off, so as to avoid
exceeding the flow rate limits indicated in the tables available in the machine Data Book.
Installation, use and maintenance manual
T
M
SA
AV
RUa
OUT
SC
T
M
SA
AV
RUa
SC
Inches
Inches
Inches
Inches / DN
IN
014
1+1/4
1+1/2
-
082
-
2+1/2
2+1/2 (*)
026
034
2
-
-
122
140
-
-
3 (*)
061
070
-
-
2
2+1/2
165
-
3 (*)
23