Front Loading Assembly Attachment Ttt - Teac MV-3010 Service Manual

Table of Contents

Advertisement

6. FRONT LOADING ASSEMBLY ATTACHMENT
To attach the Front Loading Assembly, follow the procedures below.
1) Twist the loading motor with your finger until it is in
EJECT mode.
2) Twist the FD Pinion Gear counterclockwise until it
stops. (The FD Face Gear is loose. )
3) Twist the FD face Gear counterclockwise until it
stops,
then
apply
gentle
pressure
in the
counterclockwise direction.
4) In the position at step 2) , rotate the FD Pinion Gear
clockwise. After about 3 1/2 turns, the FD Pinion Gear
should begin to interlock with the FD Relay Gear.
Now twist the FD Pinion Gear until it stops. (The
assembly should now resemble Fig. 2)
FD Gear Case
FD Relay Gear
FD Gear Case
FD Pinion Gear
re
Fig.4 MD Rear View
FD Face Gear
5) Twist the FD Pinion Gear about 1/3 of a turn
counterciockwise so that the Lift Gear R attachment
position is horizontal making attachment easier, as
shown in Fig. 3. Also, the FD Relay Gear and FD
Face Gear eye marks should be aligned when the
MD is viewed from the back. (Fig. 4)
Attach the front assembly.
Insert the first Lift Gear R between the first and
second gear of the front assembly. (Fig. 3)
6
х
Note: Do nottouch the CSP plate of the Front Loading
Assembly. (Take care not to distort it.)
CSP plate
Lift Gear
R
Align first gear on Lift Gear R.
MA-10

Advertisement

Table of Contents
loading

Table of Contents