PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.
Page 3
ACCESSING VIDEO GUIDES... ACCESSING VIDEO GUIDES... 3. Scan QR code... Some steps within this set of instructions come with an added video guide for your convenience. These can be accessed via the QR code and used to aid you in constructing that step.
Page 4
Before assembly Roof Block - 28x28x140mm QTY 6 please make sure you have a FS2828-G-160mm (angled) suitable base ready to erect your building Door Rain Guard - 28x44x1210mm QTY 1 Mortice Lock QTY 1 RG2844-1210mm PI-07-0017 Window Rain Guard - 28x44x540mm QTY 4 RG2844-540mm MADE IN GREAT BRITAIN Key Plate QTY 1...
Page 5
Step 1 Nail Bag IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 1 QTY 1 - No. 26 QTY 1 - No. 27 QTY 6 - No. 10 QTY 1 There may be extra screws present in the nail bag - No.
Page 6
Step 2 IMPORTANT: Pre-drill before xing screws. Step 3 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 15 QTY 2 Parts Needed - No. 8 QTY 2 - No. 22 QTY 1 - No. 23 QTY 8 - No. 29 QTY 2 Secure the oor (No.
Page 7
Step 7 Step 5 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 5 QTY 1 Place the assembled oor panels (No.8) on to a rm and level base. Ensure the base has suitable Place Side Panel (No. 5) onto the oor drainage, free from areas where standing water next to the back panel.
Page 8
Step 9 Step 11 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 6 QTY 1 Parts Needed - No.1 QTY 1 - No. 7 QTY 1 Place the assembled door panel (No.1) Place the Left Gable (No.6) and onto the oor in-between the already Right Gable (No.7) on top of the standing Front Window Panels (No.2).
Page 9
Step 12 Step 13 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 12 QTY 6 Parts Needed - No. 9 QTY 3 - No. 21 QTY 3 - No. 24 QTY 3 Place the rst Ridge Bar (No.21) inside Place the three roofs (No.9) together.
Page 10
Step 15 Step 14 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No.9 QTY 3 Fix the Roof Panels to the Framing - No.32 QTY 2 within the Panels and the Ridge Place the Roof Panels (No. 9) on top of Bars where they meet (internally) the building.
Page 11
Step 17 Step 18 IMPORTANT: Pre-drill before xing screws. Parts Needed - No.33 QTY 1 Parts Needed - No.16 QTY 8 Cut the felt (No.33) into 4 strips meas- Sandwich felt either side uring: between the roof and the roof trims 3140mm (L) X 1000mm (W) and lay (No.
Page 12
Step 20 Step 22 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 28 QTY 2 Parts Needed - No. 18 QTY 4 - No. 19 QTY 2 Fix the turn button’s (No. 28) to the - No.
Page 13
PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.
Need help?
Do you have a question about the 03DTSHCV1008HGD4MW-V2 and is the answer not in the manual?
Questions and answers