GE Tec 6 Plus Operation And Maintenance Manual page 57

Table of Contents

Advertisement

Step 2
Insert the bottle probe into the
filler port and then push the
bottle firmly against the spring
pressure until it is fully
engaged in the filler port.
À WARNING
Step 3
Lift the bottle upwards.
If the bottle cannot easily be
lifted, it may be because the
bottle has not been completely
inserted.
1107-0641-000
1/23/01
Operating Instructions
v
5
FIRMLY INTO:
FILLER PORT
CH
Figure 5-15 * Loading the bottle
ENSURE BOTTLE IS
FULLY ENGAGED IN
FILLER PORT
Ensure that the bottle probe is fully engaged into the filler
port before attempting to Iift the bottle. If the bottle cannot
easily be lifted, do not force it, otherwise the valve can be
broken.
Figure 5-16 * Lifting the bottle
5-15

Advertisement

Table of Contents
loading

Table of Contents