2.4 Rack Installation - Boonton 75D Instruction Manual

Direct capacitance bridge
Table of Contents

Advertisement

2.4 RACK INSTALLATION
a.
Remove the four screws at the sides of the front panel and take off the two
edge strips.
b„
Grasp the two front-panel handles and carefully slide the unit out of the
cabinet; feed the power cable through the cutout of the rear panel, and
remove the cabinet.
Co
Installation of dust covers (Part Nos. 600228 and 600229) is strongly
recommended.
These are mounted as follows:
1 .
Feed the power cable through the cutout in the lower dust cover.
20
Fasten the lower cover to the chassis bottom with six No. 6 self¬
tapping screws 1/4" long.
3.
Use eight No. 6 self-tapping 1/4" screws to fasten the upper dust
cover.
4.
Unscrew the nameplate from the rear of the cabinet and fasten it
to the rear of the upper dust cover.
d.
Install the Model 75D in the rack and secure with panel screws.
e.
Connect the power cable to an ac power receptacle.
75D
b-370
15

Advertisement

Table of Contents
loading

Table of Contents