Bosch WORCESTER Greenstar Danesmoor 18/25 Installation, Commissioning And Servicing Instruction Manual page 34

Floor standing oil-fired condensing boiler conventional flue & room sealed flue
Hide thumbs Also See for WORCESTER Greenstar Danesmoor 18/25:
Table of Contents

Advertisement

Installation
1.
B
= EARTH
= LIVE
230V
= NEUTRAL
2.
F
E
D
F
D
6720821686-06.1Wo
Fig. 56
External 230V programmer
4. Remove link (G).
▶ Connect wires as shown.
4.
N1 1 2 3 4
7 8 9 10
Fig. 57
34
A
C
3.
230V
N1 1 2 3
G
6720808218-44.1Wo
Optional Worcester 230V programmer
5. Remove blanking plate (H).
▶ Set the pin on the rear of the programmer to 'pumped'.
▶ Remove link (G) from connection 8 and 9.
▶ Clip the programmer (I) in position and connect programmer plug J
into terminals 7 to 10.
I
Fig. 58
▶ Refit fascia panel (B) to control box and secure with screws (A).
Greenstar Danesmoor Kitchen
ErP+
and Kitchen System
5.
H
G
J
*Move the orange
wire from terminal 9
to terminal 6 for a
three port system.
ErP+
-6 720 821 686 (2018/04)

Advertisement

Table of Contents
loading

Table of Contents