Husqvarna CEORA Operator's Manual page 19

Hide thumbs Also See for CEORA:
Table of Contents

Advertisement

3.
Put the 2 top baseplates on top of the lower
baseplate.
4.
Attach the top baseplates to the lower baseplate
with 6 couplings. Use a 8 mm hex key to attach the
couplings.
1691 - 006 - 09.01.2023
5.
Drill 14 holes in the ground with a 6 mm drill.
6.
Attach the charging station to the ground with the
14 supplied screws. Use a 10 mm socket wrench
to attach the screws.
CAUTION:
screws too much.
7.
Connect the mains cable to a 100-240V power
outlet.
8.
Put the product in the charging station. Push the
ON/OFF button on the product for 3 seconds to
charge the product. Refer to
on page 28 .
3.7.5.2 To do a visual check of the charging station
1.
Make sure that the LED indicator lamps on the
charging station have a green light.
2.
If the LED indicator lamps do not have a green
light, do a check of the installation. Refer to
indicator lamps on the charging station on page
43 and To install the charging station on page 18 .
3.7.6 Installation of the reference station
Install the reference station according to the instructions
in the Operator's manual for the reference station.
3.7.7 Husqvarna Fleet Services
Husqvarna Fleet Services
is a cloud solution that
gives the commercial fleet manager an overview of
Do not tighten the
To charge the battery
LED
Installation - 19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ceora 544 eposCeora 546 epos

Table of Contents