Download Print this page

Sharp ER-1911 Service Manual page 42

Hide thumbs Also See for ER-1911:

Advertisement

2) installation procedure
@ Remove the top cabinet:
@ Remove the main PWB and solder the 2-pin connector onto
the main PWB.
ER-1911, ER-2386 Main PWB
'Drawer connector
Open sensor connector
ER-1921, ER-2396 Main PWB.
[=F]
'Drawer connector
Open sensor connector
Fig. 3-18
@ Roplace the main PWB.
® Solder the 2-pin connector cable (OAGQCW230MKSS) to the
micro switch as shown Fig.3-18.
VCC
DRS
a
2-pin connector cable
WHITE
OAGQCW230MKSS
OAGQSW201MKSS
Micro switch
2
Fig.3-19,
® Remove the drawer bottom plate.
© Mount the micro switch to the lock unit using the spacer and
tooth screws. See Fig. 3-17. (No.6~9)
® Draw the connector cable and put into the same hole used for
the drawer cable, then insert to the connector.
® Replace the drawer bottom 'plats and-the top-cabinet.-
@® SRV programming (Job #913-D)
Change the service preset value as it requires at SRV mode.
919-1; 1, Drawer closing operation
2. Error system
3. Key catch sound
—a1—
{Drawerclosing | 2Eroraystem
| 3Key catch sound]
913-D
operation
Exist
0
All lock error
es
eulat
7]
jot exist
Neon compulso!
PUI
Taig ope &
Exist
ry
fock error
Not exist
3
Exi
4
Allock error
r ae
:
Compuisoryt
_
Not exist
Mis-ope &
Exist
6
lock error
Nat exist
7
[Key operation]
913 +[-}+
®
or[aFor] + wel [TL
'Set the D
3-7. Key top kit
1) List of key top kit
No.
Name
|___Description
Tt]
_ER-AiKT6
| 1x1 key top
2]
ERaKTS
| 1x 2key top
3|
ER22KT6
| 2x 2key top
4]
ER-11DK6
1x 1 Dummykey
5
ER-51DK6
5x 1 Dummykey
2) Installation procedure
@ ER-11KT6
Key top (1 x 1)
Key spring
Key frame
eg
Fig. 3-20
@ ER-12KT6
Key top (1 x 2)
far
(0)
or
ame
Key spring
Key frame
i '
Fig. 3-21

Advertisement

loading

This manual is also suitable for:

Er-1921Er-2386Er-2396