Important - please read Contents of Packaging Please read these instructions carefully before starting installation and keep for future reference. Remove all packaging and check the product for missing parts or damage before starting installation. Any alterations made to this product and fittings may infringe water regulations and will invalidate the guarantee.
Installation - Quick guide Installation Before installing your new mixer, flush Clic-Clac Control through the pipe work to ensure removal handle of debris, turn off the water supply. Ensure the O-ring is in place in the bottom of the mixer body. Position the mixer on the basin.
Page 5
Installation Operation - mixer Disassemble the push waste. Plug Unscrew the plug from the waste flange. Remove the bolt from the waste flange and body. Slide the flange seal over the waste Hex key flange, and push the bolt down through the waste flange.
•The extended guarantee is only available if you have completed the Guarantee Registration Process. This can be done via the VADO website or via phone to our aftersales team. Registration must be completed within 6 months from date of purchase.