Download Print this page

Cisco 8600 Series Manual page 8

Powering on the router
Hide thumbs Also See for 8600 Series:

Advertisement

Power Cord Retainer Mechanism
Figure 4: Parts of the Power Cord Retainer
1
2
3
Installation and Removal Sequence
Installation—After you have inserted the power supply unit into the bay, first position the clamp closest to
the power supply, near the plug round cylinder stress relief and then insert the flexible retainer strip into the
clamp hole and tighten. The clamp cannot be moved after the flexible retainer strip is inserted into the clamp
hole.
Removal—After you have turned off the power supply unit's rocker switch, first remove the flexible retainer
strip from the clamp hole and then adjust the position of the clamp to remove the power cord.
Positioning the Clamp
In figure,
clamp in direction 3b, use a flathead screwdriver or similar device and push the clamp latch down. The figure,
Powering on the Router
8
The end that is fixed to the power supply
unit
Clamp which can move towards the power
supply or away from it
Clamp latch
Figure 5: Positioning the
Clamp, the clamp can always move freely in direction 3a. To move the
4
Flexible retainer strip
5
Retainer strip latch
Powering on the Router

Advertisement

loading