STEP 3—ROUTE CABLE THROUGH UPRIGHT AND MAIN FRAME ASSEMBLIES
TOOLS NEEDED
Allen Wrench
Wrench
Socket Wrench
Cable Puller
NOTE: The upright cable is routed through the pulley assembly and lower main frame to the upright assembly, while the
main frame cable is routed through the pulley assembly. The left end of the upright cable goes to the weight stack side
while the right end goes to the main frame cable attachment point.
ITEM
PART
1
SPL-09-UPR200X
2
SPL-09-MFR250X
3
SPL-07-PHG000X
4
SD0183
5
SPL-09-CBL000
6
SPL-09-CBL100X
7
C1258
8
C 766A
9
C 754B
10
C1260
11
C 749B
12
SPL-00-CBL003
6
DESCRIPTION
UPRIGHT ASSEMBLY
MAIN FRAME WELDMENT ASSEMBLY
PULLEY ASSEMBLY
PULLEY 114MM
SUBASSEMBLY, CABLE, MAIN FRAME, SPL0900
SUBASSEMBLY, CABLE, UPRIGHT, SPL0900
LPSHCS, 3/8"-16 X 1-3/4" E-COAT
LOCK NUT, 3/8"-16 X 17/64", NYLON
WASHER, FLAT, 3/8" SAE, BLK
LPSHCS, 3/8"-16 X 2" E-COAT
LOCK WASHER, 3/8", BLK ZP
BOLT, CABLE
5
QTY
1
1
1
5
1
1
3
3
6
4
2
3
23