Microwave Measurement - Sharp R-6R50 Service Manual

Grill and microwave oven
Table of Contents

Advertisement

§-6R50(W}/{B)}
3-6G50(W)}/{B)
3-6G52(W)/(B)
3-6R70(W)/(B)
(Refere to Figure C-3.)
For 1st latch switch;
switch.
For other switches;
The switches can be removed by doing proce-
dure as same as above.
CAUTION:
WHEN
REMOVING
THE
SWITCHES,
DON'T
BREAK
THE
TABS
OF
THE
LATCH HOOK,
Laich hook
Stop switch
Push backwards
2nd latch
switch
Push upwards
Pull forwards
Push backwards
Monitor switch
Tst laich
"==
switch
Push leftwards
Figure C-3. Switch
Removal
Stop switch
Monitor
switch
tsi latch
swiich
Switch Jevar
Open lever
Open
button
si
peat.
pee,
4
i
Rs
Q
'
R-6R50{
R-6G50|
R-6G52
R-6R70(
MICROWAVE
MEASUREMENT
|
After
adjustment
of door
latch switches,
monitor
switch and door are completed individually or collec-
tively, the following
leakage test must be performed
with a survey instrument and it must be confirmed that
the result meets the requirements of the performance
standard for microwave oven.
REQUIREMENT
The safety switch
must prevent microwave
radiation
emission
in excess of 5mW/cm2
at any point 5cm or
more from external surface of the oven.
PREPARATION
FOR TESTING:
Before beginning the actual test for leakage, proceed
as follows;
1. Make
sure
that the test instrument
is operating
normally as specified in its instruction booklet.
Important:
Survey instruments that comply with the require-
ment for instrumentations as prescribed by the per-
formance
standard
for microwave
ovens
must be
used for testing.
an
Recommended
instruments are:
NARDA 8100
NARDA 8200
HOLADAY
HI]! 1500
SIMPSON
380M
. Place the oven tray into the oven cavity.
a
. Place the load of 275 +15ml of water initially at
20 +5 °C in the center of the oven tray. The water
container should be a low form of 600 mi beaker
with inside diameter of approx. 8.5cm and made of
an
electrically
non-conductive
material
such
as
glass or plastic.
The placing of this standard load in the oven is im-
portant not only to protect the oven, but also to in-
sure that any leakage is measured accurately.
. Close the door and turn the oven ON with the timer.
set for several minutes. If the water begins to boil
before the survey
is completed,
replace
it with
275m! of the coo! water.
. Move the probe slowly (not faster that 2.5cm/sec.)}
along the gap.
. The microwave radiation emission should be meas-
ured at any point of 5cm or more from the external

Advertisement

Table of Contents
loading

Table of Contents