Utility Closet Connection Locations

IMPORTANT: Plan and locate plenum, electrical connection, drains and thermostat carefully to avoid
Small Chassis
Use rigid duct for
90° bends and tees
conduit for direct
connection
Grille Kit
RAVAL2
Part A
Outside
Wall
Plenum

Installation

Flex duct may be used
for transitions only
Outside wall
Raised Platform
Surface
recommended 8"
minimum height.
Exterior
Outside
Part B
Wall
Inside
Wall Plenum
– 14 –
Reference Dimensions
A Thermostat cable
B Incoming Power Conduit
C
D Unit height: 30-5/8" (32-3/4" with
duct)
E Condensate drains: 3/4" connector
Choose one of THREE Primary
Drain
locations:
1 - Right Side
1 - Left Side
1 - Back (Plenum) Side
plenum from the back of the unit.
Unit slides into wall plenum
approximately 2".
Primary Drains
A drain connection is located on the
back of the unit approximately 2" from
the left side.
A drain connection is located on
the right and left side of the unit
approximately 16" from the front of the
unit.
Small Chassis
(Unit Height 32")
Filter (14" x 20")
Unit