DENT Instruments PowerScout 12 HD Quick Start Manual

Networked metering systems
Hide thumbs Also See for PowerScout 12 HD:

Advertisement

Quick Links

PowerScout
PowerScout
Networked Metering Systems
© DENT Instruments, Inc. | 925 SW Emkay Drive, Bend, OR 97702 USA
www.dentinstruments.com | support@dentinstruments.com | 800-388-0770
DENT INSTRUMENTS | QUICK START GUIDE | RELEASE DATE DEC 31, 2018
Quick Start Guide
and
ViewPoint
Software
12 HD
48 HD
HD
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PowerScout 12 HD and is the answer not in the manual?

Questions and answers

Summary of Contents for DENT Instruments PowerScout 12 HD

  • Page 1 PowerScout 48 HD ™ Networked Metering Systems ViewPoint ™ Software © DENT Instruments, Inc. | 925 SW Emkay Drive, Bend, OR 97702 USA www.dentinstruments.com | support@dentinstruments.com | 800-388-0770 DENT INSTRUMENTS | QUICK START GUIDE | RELEASE DATE DEC 31, 2018...
  • Page 2 A qualified person is one who has skills and knowledge related to the construction and operation of this electrical equipment, and the installation, and has received safety training to recognize and avoid the hazards involved. NEC2011 Article 100 No responsibility is assumed by DENT Instruments for any consequences arising out of the use of this material.
  • Page 3: Technical Specifications

    3.3V sourcing voltage (current limited) to user dry contact pulse output Maximum Pulse Rate 10 HZ (50 msec minimum transition time) Communication Hardware RS-485, Ethernet, & USB (for configuration only) DENT INSTRUMENTS | QUICK START GUIDE | RELEASE DATE DEC 31, 2018...
  • Page 4 Serial/Ethernet Meters The following are UL Recognized: PS12HD-B-y-z, PS12HD-P-y-z, PS48HD-B-y-z, PS48HD-P-y-z The following are UL Listed: PS12HD-C-y-z , PS48HD-C-y-z Conforms to UL Std 61010-1, 3rd Edition, UL 61010-2-30:2010 DENT INSTRUMENTS | QUICK START GUIDE | RELEASE DATE DEC 31, 2018...
  • Page 5: Mechanical Specifications

    Certified to CSA Std C22.2 No. 61010-1, 3rd Edition MECHANICAL SPECIFICATIONS PS48HD Enclosure Dimensions PS12HD Enclosure Dimensions DENT INSTRUMENTS | QUICK START GUIDE | RELEASE DATE DEC 31, 2018...
  • Page 6 Enclosure Internal Mounting Hole Locations PS48HD and PS12HD Enclosure Drill Templates DENT INSTRUMENTS | QUICK START GUIDE | RELEASE DATE DEC 31, 2018...
  • Page 7 Sheet Metal Plate Mounting Hole Locations PS48HD and PS12HD Mounting Plate Drill Templates DENT INSTRUMENTS | QUICK START GUIDE | RELEASE DATE DEC 31, 2018...
  • Page 8: Installation Sequence

    The centerline holes are intended for fastening to wall studs. If hollow wall fasteners are used, the outer 4 mounting points are recommended. DENT INSTRUMENTS | QUICK START GUIDE | RELEASE DATE DEC 31, 2018...
  • Page 9 STEP 3) Mount conduit fittings, conduits, and blanking plugs STEP 4) Connect voltage leads DO NOT ENERGIZE METER WITH VOLTAGE COVER REMOVED DENT INSTRUMENTS | QUICK START GUIDE | RELEASE DATE DEC 31, 2018...
  • Page 10 A voltage lead of 14 AWG THHN Minimum 600VAC rating (or equivalent) is required. IMPORTANT: Verify the circuit breaker is marked as the disconnect breaker for the meter. DENT INSTRUMENTS | QUICK START GUIDE | RELEASE DATE DEC 31, 2018...
  • Page 11: Wiring Examples

    Single Phase L1-N or L2-N 110 VAC: Lighting, Appliance, Living Zone • Single Phase L1–L2 220 VAC: Water Heater, Clothes Dryer, Equipment with no neutral wire. Split Phase L1–L2 220 VAC: Service Entrance, Equipment with neutral wire. • DENT INSTRUMENTS | QUICK START GUIDE | RELEASE DATE DEC 31, 2018...
  • Page 12 Note: The PSHD Meter Series uses the “Neutral” Terminal as a voltage reference. For systems without a neutral conductor, DENT Instruments suggests connecting a ground wire to this terminal. If the neutral terminal is left open, L-L measurements will be accurate, but L-N measurements may not be symmetric.
  • Page 13 “single phase” service and configure each channel individually. Three phase loads are illustrated on the left and split phase loads on the right as an example only. Elements are fully interchangeable on the meter. DENT INSTRUMENTS | QUICK START GUIDE | RELEASE DATE DEC 31, 2018...
  • Page 14: Communication Verification

    Refer to the section on Configuration Details for an overview and list of instructional videos for ViewPoint HD or the PSHD Web App. DENT INSTRUMENTS | QUICK START GUIDE | RELEASE DATE DEC 31, 2018...
  • Page 15: Other Features

    4-20 mA current loop devices. If full-rated current is drawn from this terminal, the minimum operating voltage of the L1-L2 power supply is 100 VAC. DENT INSTRUMENTS | QUICK START GUIDE | RELEASE DATE DEC 31, 2018...

This manual is also suitable for:

Powerscout 48 hd

Table of Contents