INSTALLATION, OPERATION and MAINTENANCE Figure 942SS Combination Air Valves INTRODUCTION the water level rises lifting the float and re- This manual will provide the information to closing the small orifice. This sequence occurs properly install, operate and maintain the valve as often as necessary to release air and gas that to ensure a long service life.
valve using wrench flats. DO NOT OVER- grease and require periodic cleaning. TIGHTEN. facilitate such cleaning GA Industries air valves with an “F” at the end of the Figure Number (e.g., 942F) were supplied with “backflushing Flat-faced flanged valves should be mated with flat-faced flanges and full-face gaskets.
Disassemble the valve only as far as needed to Install hex nut (20) and lock washer (24) onto replace damaged or worn parts. end of float rod (10). Apply Loctite 263 to the threads on the float rod (10) and screw float ball First ensure there is no pressure within the (12) onto float rod (10).
REPLACEMENT PARTS REPAIR KITS Genuine replacement parts are available from Soft Goods Kit A942-2 (Part Number 2-80- your local VAG/GA Industries representative or 11000-024) includes Items 8, 14, 15, 16, 22 & from the factory: VAG USA, LLC Linkage Kit AL942-2 (Part Number 2-80-11000-...
Need help?
Do you have a question about the GA 942SS and is the answer not in the manual?
Questions and answers