Table 4. Adapter placement priority (continued)
Placement
Feature
Priority
Code
2
AJZL
3
AJZN
4
AJP1
Objectives
• Install the new adapter pair, one in each server canister, by using an online process.
• Incorporate the new interfaces into an existing single master bond.
High-level MES upgrade steps
1. Prepare canister A/1 slot for adapter MES.
2. Unmount file systems mounted on canister A/1.
3. Shut down GPFS only in canister A/1.
4. Remove canister A/1 from the enclosure.
5. Install the hardware - add one adapter to the available slot in canister A/1.
6. Reinsert canister A/1 into enclosure and do basic checks.
7. Incorporate new interfaces to the existing single master bond in canister A/1.
8. Start GPFS in canister A/1.
9. Remount file systems to canister A/1.
10. Prepare canister B/2 slot for adapter MES.
11. Unmount file systems mounted on canister B.
12. Shut down GPFS only in canister B/2.
13. Remove canister B/2 from the enclosure.
14. Install the hardware - add one adapter to the available slot in canister B/2.
15. Reinsert canister B/2 into enclosure and do basic checks.
16. Incorporate new interfaces to the existing single master bond in canister B/2.
17. Start GPFS in canister B/2.
18. Remount file systems to canister B/2.
Note:
• Steps 1 – 3 are to be customer tasks
• Steps 4 – 6 are SSR tasks
• Steps 7 – 12 are expected to be customer tasks
• Steps 13 – 15 are SSR tasks
• Steps 16 – 18 are expected to be customer tasks
Description
Paired adapters to be installed in the same slot of BOTH
canisters
st
1
pair
CX6
Slot 1
InfiniBand/V
PI
CX6 DX
Slot 1
(Ethernet
only)
CX5
Slot 1
InfiniBand/V
PI
nd
rd
2
pair
3
pair
Slot 3
Slot 2
Slot 3
Slot 2
Slot 3
Slot 2
Chapter 1. Servicing (customer tasks)  25
th
4
pair
Slot 4
Slot 4
Slot 4

Advertisement