Bosch DWK67FN60 User Manual And Installation Instructions page 19

Hide thumbs Also See for DWK67FN60:
Table of Contents

Advertisement

¡ To install additional special accessory parts, ob-
serve the enclosed installation instructions.
¡ The width of the extractor hood must correspond at
least with the width of the hob.
¡ To optimally detect the cooking vapours, install the
appliance in the middle of the hob.
19.8 Instructions for the exhaust air pipe
The appliance manufacturer does not provide any war-
ranty for faults attributable to the pipeline.
¡ Use a short, straight exhaust air pipe with as large a
pipe diameter as possible.
¡ Long, rough exhaust air pipes, many pipe bends or
small pipe diameters reduce the suction power and
increase the fan noise.
¡ Use an exhaust air pipe that is made of non-com-
bustible material.
¡ To prevent condensate from returning, fit the ex-
haust pipe with a 1° gradient from the appliance.
19.9 Instructions for the air extraction mode
For air extraction mode, a one-way flap should be in-
stalled.
Notes
¡ If a one-way flap is not included with the appliance,
one can be ordered from a specialist retailer.
¡ If the exhaust air is conveyed through the external
wall, a telescopic duct should be used.
19.10 Installation
Checking the wall
Check whether the wall is horizontal and adequately
1.
load-bearing.
The maximum weight of the appliance is 30 kg.
Drill the hole depth in accordance with the length of
2.
the screws.
Use the enclosed screws and wall plugs.
3.
The enclosed screws and wall plugs are suitable for
use with solid brickwork. Use suitable fixing material
for other structures, e.g. plasterboard, porous con-
crete, poroton bricks.
Install the appliance with a fixing material which is
4.
sufficiently stable and has been adjusted accord-
ingly for both the structural conditions and the
weight of the appliance.
Check the cut-out area for existing cables of other
5.
appliances.
Preparing the wall
Observe the information on the installation situation.
1.
→ Page 18
Ensure that there are no electrical wires, gas pipes
2.
or water pipes in the area where holes are to be
drilled.
Cover the hob to prevent damage.
3.
Determine the position of the extractor hood and
4.
lightly mark where the lower edge of the appliance
should be on the wall.
Determine the centre of the hob.
Comply with the safety clearances for the hob.
We recommend fitting the extractor hood in such a
way that the lower edge of the glass panel is in line
with the lower edges of the adjacent wall-hung cab-
inets.
5.
To make the installation easier, apply and secure
the packaging section that is used as the template
to the line that is marked out.
Mark the positions of the fastening screws.
6.
It is preferable to mark the position for the safety
7.
screw on the right-hand side.
8.
For the installation with the flue cover, separate the
template along the marked cut line.
Place the detached part at the required position.
9.
Observe the entire length of the flue duct.
Drill the hole depth in accordance with the length of
10.
the screws.
Insert the wall plugs flush with the wall.
11.
Installing the appliance bracket
Remove the angle bracket for the flue duct.
1.
Align the appliance bracket for the extractor hood
2.
and screw it on hand-tight.
Use a spirit level to align the appliance bracket hori-
3.
zontally and screw it firmly in place.
Installation instructions en
19

Advertisement

Table of Contents
loading

Table of Contents